Triple
T1081674
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | PAC-2 |
E23959
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | surface-to-air missile system variant |
C3642
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: surface-to-air missile system variant Context triple: [PAC-2, instanceOf, surface-to-air missile system variant]
-
A.
air-to-surface missile
An air-to-surface missile is a guided weapon launched from an aircraft and designed to strike targets on land or at sea with high precision.
-
B.
air-to-air missile
An air-to-air missile is a guided weapon launched from an aircraft to destroy or disable another airborne target using onboard sensors and propulsion.
-
C.
integrated air defence system
An integrated air defence system is a coordinated network of sensors, command and control elements, and weapon systems designed to detect, track, and engage aerial threats to protect designated airspace and assets.
-
D.
radar-guided missile
chosen
A radar-guided missile is a self-propelled weapon that uses onboard or external radar signals to detect, track, and home in on a target during flight.
-
E.
beyond-visual-range missile
A beyond-visual-range missile is a guided weapon designed to engage and destroy targets at distances beyond the launching platform’s line of sight, typically using radar or other long-range targeting systems.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a493f1ddf48190a99d54b00e99f8ce |
completed | March 1, 2026, 7:30 p.m. |
Created at: March 1, 2026, 7:42 p.m.