Triple

T107852
Position Surface form Disambiguated ID Type / Status
Subject 2024 Summer Olympics E2178 entity
Predicate closingDate P140 FINISHED
Object 2024-08-11 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2024-08-11 | Statement: [2024 Summer Olympics, closingDate, 2024-08-11]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: closingDate
Context triple: [2024 Summer Olympics, closingDate, 2024-08-11]
  • A. endDate chosen
    Indicates the point in time at which an event, state, or relationship stops being valid or comes to a conclusion.
  • B. concludedAt
    Indicates the point in time at which an event, process, or relationship comes to an end or is completed.
  • C. surrenderDate
    Indicates the date on which an entity formally yields control, possession, or rights, typically ending its claim or resistance.
  • D. dateSigned
    Indicates the specific date on which an agreement, document, or contract was formally signed.
  • E. proposalDate
    Indicates the date on which a proposal is formally made or submitted from one entity to another.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a24fcdaeb48190a2d796677e4b3281 completed Feb. 28, 2026, 2:15 a.m.
NER Named-entity recognition batch_69a25a1199ac8190ac65ffaaf45b4f5b completed Feb. 28, 2026, 2:59 a.m.
PD Predicate disambiguation batch_69a2563e7188819091e9a94e071991d7 completed Feb. 28, 2026, 2:43 a.m.
Created at: Feb. 28, 2026, 2:20 a.m.