Triple

T10772521
Position Surface form Disambiguated ID Type / Status
Subject Crystal City Underground (pedestrian network) E254116 entity
Predicate instanceOf P0 FINISHED
Object underground shopping concourse C4955 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: underground shopping concourse
Context triple: [Crystal City Underground (pedestrian network), instanceOf, underground shopping concourse]
  • A. shopping centre
    A shopping centre is a large complex of retail stores, services, and often entertainment facilities planned and managed as a single commercial property.
  • B. shopping mall
    A shopping mall is a large, often enclosed commercial complex that houses multiple retail stores, dining options, and services connected by shared walkways and common areas.
  • C. shopping area
    A shopping area is a designated space, such as a street, district, or complex, where multiple retail stores and related services are concentrated for consumer purchasing and leisure activities.
  • D. rail transit mall
    A rail transit mall is an urban corridor where rail vehicles, such as trams or light rail, operate in a street environment prioritized for transit and pedestrians, with limited or restricted access for private automobiles.
  • E. underground structure chosen
    An underground structure is a man-made construction built below the earth’s surface to provide space, protection, or support for various human activities or infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa5f54f4819082d0bbcb6f8797e6 completed April 8, 2026, 7:19 p.m.
Created at: April 8, 2026, 9:16 p.m.