Triple

T107649
Position Surface form Disambiguated ID Type / Status
Subject Orly Airport E2174 entity
Predicate otherMainParisAirport P7892 FINISHED
Object Charles de Gaulle Airport E2173 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Charles de Gaulle Airport | Statement: [Orly Airport, otherMainParisAirport, Charles de Gaulle Airport]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Charles de Gaulle Airport
Context triple: [Orly Airport, otherMainParisAirport, Charles de Gaulle Airport]
  • A. Charles de Gaulle Airport chosen
    Charles de Gaulle Airport is the largest international airport in France and a major European aviation hub serving the Paris metropolitan area.
  • B. Aéroport Charles de Gaulle 2 TGV station
    Aéroport Charles de Gaulle 2 TGV station is a major high-speed rail hub integrated into Paris Charles de Gaulle Airport, providing direct TGV and other long-distance train connections to cities across France and neighboring countries.
  • C. Aéroport Charles de Gaulle 1 station
    Aéroport Charles de Gaulle 1 station is a major rail and transit hub serving Terminal 1 and nearby facilities at Paris Charles de Gaulle Airport, connecting the airport to central Paris and the wider region.
  • D. Roissy-en-France
    Roissy-en-France is a commune in the northeastern suburbs of Paris best known for hosting most of Charles de Gaulle Airport, France’s largest international air hub.
  • E. Paris airport system
    The Paris airport system is the network of major international and domestic airports serving the Paris metropolitan area, primarily including Charles de Gaulle and Orly, which together form one of Europe’s busiest air transport hubs.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: otherMainParisAirport
Context triple: [Orly Airport, otherMainParisAirport, Charles de Gaulle Airport]
  • A. airportOfficialName
    Indicates the officially designated full name of an airport as recognized by authorities or governing bodies.
  • B. airlineHub
    Indicates that a particular location (typically an airport or city) serves as a central hub or primary operational base for an airline.
  • C. airportServed
    Indicates that a particular airport provides service to, or is used for air travel to and from, a given location or area.
  • D. airportLocatedIn
    Indicates that an airport is geographically situated within a specific administrative or territorial area.
  • E. hasMajorAirport
    Indicates that a location possesses at least one significant airport that serves as a primary hub for air travel in that area.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a24fcdaeb48190a2d796677e4b3281 completed Feb. 28, 2026, 2:15 a.m.
NER Named-entity recognition batch_69a25a1199ac8190ac65ffaaf45b4f5b completed Feb. 28, 2026, 2:59 a.m.
NED1 Entity disambiguation (via context triple) batch_69a2b01662f88190a4997a3e86c17946 completed Feb. 28, 2026, 9:06 a.m.
PD Predicate disambiguation batch_69a2563e7188819091e9a94e071991d7 completed Feb. 28, 2026, 2:43 a.m.
PDg Predicate description generation batch_69a25a10d6448190bee47847d5c13b84 completed Feb. 28, 2026, 2:59 a.m.
Created at: Feb. 28, 2026, 2:20 a.m.