Triple

T10696646
Position Surface form Disambiguated ID Type / Status
Subject Aurora Bridge E252160 entity
Predicate carries P1393 FINISHED
Object State Route 99 E430113 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: State Route 99 | Statement: [Aurora Bridge, carries, State Route 99]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: State Route 99
Context triple: [Aurora Bridge, carries, State Route 99]
  • A. State Route 99
    State Route 99 is a major north–south California highway running through the Central Valley and connecting cities such as Sacramento with other key urban and agricultural regions.
  • B. State Route 99 chosen
    State Route 99 is a major north–south highway in Washington State that runs through Seattle and serves as a key alternative to Interstate 5.
  • C. State Route 91
    State Route 91 is a major east–west freeway in Southern California that connects the Los Angeles metropolitan area with the Inland Empire and Orange County.
  • D. State Route 98
    State Route 98 is a California state highway in Imperial County that serves as an east–west corridor near the U.S.–Mexico border, connecting communities such as Calexico to other regional routes.
  • E. State Route 93
    State Route 93 is a state highway in Georgia that serves as a regional connector through rural communities, including areas within Grady County.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa5bd7c08190a816e733b4045c23 completed April 8, 2026, 7:19 p.m.
NER Named-entity recognition batch_69d6fd89390c8190969ab2b4a79d5818 completed April 9, 2026, 1:14 a.m.
NED1 Entity disambiguation (via context triple) batch_69fba1ab899081908f16439de65f442b completed May 6, 2026, 8:16 p.m.
Created at: April 8, 2026, 9:11 p.m.