Triple

T10674201
Position Surface form Disambiguated ID Type / Status
Subject I-94 E251570 entity
Predicate hasJunctionWith P1018 FINISHED
Object I-55 E38193 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: I-55 | Statement: [I-94, hasJunctionWith, I-55]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: I-55
Context triple: [I-94, hasJunctionWith, I-55]
  • A. Interstate 55 chosen
    Interstate 55 is a major north–south U.S. highway running from Louisiana to Illinois, connecting cities such as New Orleans, Memphis, and Chicago.
  • B. Interstate 49
    Interstate 49 is a major north–south U.S. Interstate Highway running through multiple states in the central United States, including Missouri.
  • C. Interstate 57
    Interstate 57 is a major north–south U.S. Interstate Highway running from Chicago, Illinois, to Sikeston, Missouri, serving as a key route through the central United States.
  • D. Interstate 205
    Interstate 205 is a major auxiliary Interstate Highway that serves as an eastern bypass of Portland, Oregon, connecting I-5 in Oregon to I-5 in Washington across the Columbia River.
  • E. Interstate 205
    Interstate 205 is a major auxiliary Interstate Highway in California that serves as a key connector between Interstate 5 and Interstate 580, facilitating traffic between the Central Valley and the San Francisco Bay Area.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa5b0d2881909584b20efc5877f0 completed April 8, 2026, 7:19 p.m.
NER Named-entity recognition batch_69d6fb9299708190a0a3818f2e4e9bf5 completed April 9, 2026, 1:06 a.m.
NED1 Entity disambiguation (via context triple) batch_69fffee0ff948190911c02f6e50ea2bc completed May 10, 2026, 3:43 a.m.
Created at: April 8, 2026, 9:09 p.m.