Triple

T10665909
Position Surface form Disambiguated ID Type / Status
Subject Almaty Metro E251356 entity
Predicate constructionResumption P5779 FINISHED
Object 2000s LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2000s | Statement: [Almaty Metro, constructionResumption, 2000s]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: constructionResumption
Context triple: [Almaty Metro, constructionResumption, 2000s]
  • A. constructionResumed chosen
    Indicates that previously halted construction activity on an entity or project has started again.
  • B. constructionResumedBy
    Indicates that a previously halted or paused construction activity is restarted or continued by a specified agent or entity.
  • C. constructionInterruptedBy
    Indicates that an ongoing construction process is halted, delayed, or disrupted due to the actions or occurrence of another specified entity or event.
  • D. constructionHalted
    Indicates that an ongoing construction activity or project has been stopped or suspended before completion.
  • E. constructionContinuedUnder
    Indicates that construction activity on something persisted or proceeded during the time or under the authority, control, or conditions associated with a specified entity or period.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa5b0d2881909584b20efc5877f0 completed April 8, 2026, 7:19 p.m.
NER Named-entity recognition batch_69d6f31f87748190bb44db8afa901763 completed April 9, 2026, 12:30 a.m.
PD Predicate disambiguation batch_69d6dd8753108190b799ffa0c760526e completed April 8, 2026, 10:58 p.m.
Created at: April 8, 2026, 9:08 p.m.