Triple

T10656696
Position Surface form Disambiguated ID Type / Status
Subject Texas State Highway 121 E251106 entity
Predicate operatedInPartBy P50841 FINISHED
Object North Texas Tollway Authority E256089 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: North Texas Tollway Authority | Statement: [Texas State Highway 121, operatedInPartBy, North Texas Tollway Authority]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: North Texas Tollway Authority
Context triple: [Texas State Highway 121, operatedInPartBy, North Texas Tollway Authority]
  • A. North Texas Tollway Authority chosen
    The North Texas Tollway Authority is a regional agency responsible for developing, operating, and maintaining toll roads and related transportation infrastructure in the North Texas area.
  • B. Texas Department of Transportation
    The Texas Department of Transportation is the state agency responsible for planning, building, and maintaining Texas’s highway system and other key transportation infrastructure.
  • C. Denton County Transportation Authority
    Denton County Transportation Authority is a regional public transit agency in North Texas that operates bus and rail services primarily within Denton County and connects to the broader Dallas–Fort Worth transportation network.
  • D. Oklahoma Turnpike Authority
    The Oklahoma Turnpike Authority is the state agency responsible for financing, constructing, and operating Oklahoma’s system of toll roads and turnpikes.
  • E. Dallas North Tollway
    Dallas North Tollway is a major north–south toll road in the Dallas–Fort Worth metroplex that connects downtown Dallas with its northern suburbs.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: operatedInPartBy
Context triple: [Texas State Highway 121, operatedInPartBy, North Texas Tollway Authority]
  • A. alsoOperatedBy
    Indicates that an entity is additionally operated or managed by another operator, alongside any primary or other operators.
  • B. operatedAmong
    Indicates that an entity carried out operations or activities within, or in coordination with, a specified group, set, or collection of other entities.
  • C. operatedPortionsOf chosen
    Indicates that an agent has performed operational control or management over specific parts or segments of a larger system, asset, or entity.
  • D. oftenOperatedBy
    Indicates that an entity is frequently or typically operated, controlled, or run by another entity.
  • E. operatedAs
    Indicates that an entity functioned or was used in the capacity, role, or identity of another entity for some period of time.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aa5a4c4881908f39be6efe5981e5 completed April 8, 2026, 7:19 p.m.
NER Named-entity recognition batch_69d6e0157dbc81909ef7d61f65b2fd93 completed April 8, 2026, 11:09 p.m.
NED1 Entity disambiguation (via context triple) batch_69d97a7aa490819094c7eaf3fc5e2c43 completed April 10, 2026, 10:32 p.m.
PD Predicate disambiguation batch_69d6dd8753108190b799ffa0c760526e completed April 8, 2026, 10:58 p.m.
Created at: April 8, 2026, 9:07 p.m.