Triple
T10573294
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | US 23 |
E249546
|
entity |
| Predicate | overlapsWith |
P1867
|
FINISHED |
| Object | US 52 |
E598425
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: US 52 | Statement: [US 23, overlapsWith, US 52]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: US 52 Context triple: [US 23, overlapsWith, US 52]
-
A.
US 82
US 82 is a major east–west U.S. Highway running across the southern United States, passing through states such as New Mexico, Texas, Arkansas, Mississippi, Alabama, and Georgia.
-
B.
U.S. Route 52
chosen
U.S. Route 52 is a major United States highway running diagonally across the Midwest and Southeast, connecting cities from North Dakota to South Carolina.
-
C.
U.S. Route 550
U.S. Route 550 is a major north–south U.S. highway in the Four Corners region, known for its scenic and mountainous stretches through New Mexico and Colorado, including the famed “Million Dollar Highway.”
-
D.
U.S. Route 501
U.S. Route 501 is a U.S. Highway running through Virginia and North Carolina that serves as a key north–south transportation corridor connecting cities such as Durham and Myrtle Beach.
-
E.
US 23
US 23 is a major north–south United States highway running from Florida to Michigan, serving as an important regional transportation corridor.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d381c8bd708190acf3d275c908251e |
completed | April 6, 2026, 9:50 a.m. |
| NER | Named-entity recognition | batch_69d5274929cc81909a79d5e2049f7389 |
completed | April 7, 2026, 3:48 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69d94b5d89748190bb398943e4a16e9b |
completed | April 10, 2026, 7:11 p.m. |
Created at: April 6, 2026, 12:37 p.m.