Triple

T10554
Position Surface form Disambiguated ID Type / Status
Subject Pierre Charles L’Enfant E215 entity
Predicate instanceOf P0 FINISHED
Object urban planner C106 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: urban planner
Context triple: [Pierre Charles L’Enfant, instanceOf, urban planner]
  • A. planned city
    A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
  • B. city
    A city is a densely populated, structured urban area characterized by extensive infrastructure, diverse economic activities, and complex social, cultural, and political systems.
  • C. civic leader
    A civic leader is an individual who actively guides, organizes, and advocates within a community or public sphere to address collective needs, shape policy, and promote the common good.
  • D. development expert chosen
    A development expert is a professional who applies specialized knowledge, tools, and methodologies to plan, implement, and optimize projects or programs that drive sustainable growth and improvement in a specific domain or region.
  • E. metropolitan area
    A metropolitan area is a densely populated urban region consisting of a central city and its surrounding suburbs and satellite communities, linked by economic, social, and infrastructural ties.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a23d7ad88c8190bffe8ab091d86642 completed Feb. 28, 2026, 12:57 a.m.
Created at: Feb. 28, 2026, 1:02 a.m.