Triple

T105132
Position Surface form Disambiguated ID Type / Status
Subject Schuylkill River Trail E2122 entity
Predicate instanceOf P0 FINISHED
Object bicycle trail C646 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bicycle trail
Context triple: [Schuylkill River Trail, instanceOf, bicycle trail]
  • A. rail trail chosen
    A rail trail is a multi-use path created from a disused railway corridor, typically used for walking, cycling, and other non-motorized recreation and transportation.
  • B. long-distance hiking trail segment
    A long-distance hiking trail segment is a defined portion of an extended hiking route, characterized by continuous path alignment, consistent difficulty and terrain, and clear start and end points used for planning, navigation, and management.
  • C. parkway
    A parkway is a landscaped, often scenic roadway designed primarily for leisurely automobile travel, typically with limited access and separated from commercial development.
  • D. street
    A street is a public thoroughfare in an urban or suburban area, typically bordered by buildings, that facilitates vehicular and pedestrian movement and often supports various social and commercial activities.
  • E. traffic circle
    A traffic circle is a circular intersection where vehicles travel counterclockwise around a central island, yielding to circulating traffic to manage flow and reduce conflict points.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a24e0a5b7c81908d52da08c60dabc4 completed Feb. 28, 2026, 2:08 a.m.
Created at: Feb. 28, 2026, 2:12 a.m.