Triple

T10502407
Position Surface form Disambiguated ID Type / Status
Subject STS-400 E247703 entity
Predicate contingencyForMission P94511 FINISHED
Object STS-125 E49339 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-125 | Statement: [STS-400, contingencyForMission, STS-125]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-125
Context triple: [STS-400, contingencyForMission, STS-125]
  • A. STS-125 chosen
    STS-125 was NASA’s final Space Shuttle servicing mission to upgrade and repair the Hubble Space Telescope, extending its scientific capabilities and operational life.
  • B. STS-133
    STS-133 was a 2011 NASA Space Shuttle mission that delivered supplies and the Permanent Multipurpose Module to the International Space Station as part of the final flights of the shuttle program.
  • C. STS-134
    STS-134 was the penultimate mission of NASA’s Space Shuttle program, a 2011 flight of Endeavour to the International Space Station that delivered the Alpha Magnetic Spectrometer and other critical hardware.
  • D. STS-128
    STS-128 was a 2009 NASA Space Shuttle Discovery mission to the International Space Station that delivered supplies, equipment, and a new crew member as part of the station’s assembly and resupply efforts.
  • E. STS-135
    STS-135 was the final mission of NASA’s Space Shuttle program, flown by Atlantis in 2011 to resupply the International Space Station and conclude the shuttle era.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: contingencyForMission
Context triple: [STS-400, contingencyForMission, STS-125]
  • A. usedByMission
    Indicates that something (such as a resource, tool, or method) is utilized or employed in the execution of a particular mission.
  • B. intendedMission
    Indicates that one entity is the planned or designated mission, task, or objective associated with another entity.
  • C. capturesMissionOf
    Indicates that one entity records, represents, or encapsulates the mission or overarching purpose of another entity.
  • D. isTargetOfMission
    Indicates that an entity is the intended objective or focus of a particular mission or operation.
  • E. partOfMission
    Indicates that one entity is a component, phase, or element belonging to or included within a larger mission.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381c4aa948190942e1d803143fb0e completed April 6, 2026, 9:49 a.m.
NER Named-entity recognition batch_69d5099c6a848190bf1d5361e9e61108 completed April 7, 2026, 1:41 p.m.
NED1 Entity disambiguation (via context triple) batch_69d9882acd348190ae3ab2f17c834aef completed April 10, 2026, 11:30 p.m.
PD Predicate disambiguation batch_69d4fb8e24ac8190912c9f11b8bd3084 completed April 7, 2026, 12:41 p.m.
PDg Predicate description generation batch_69d4fe46a6448190b061bc3545835cad completed April 7, 2026, 12:53 p.m.
Created at: April 6, 2026, 12:25 p.m.