Triple

T10502016
Position Surface form Disambiguated ID Type / Status
Subject Launch Control Centre (Satish Dhawan Space Centre) E247694 entity
Predicate instanceOf P0 FINISHED
Object spaceflight ground facility C4504 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: spaceflight ground facility
Context triple: [Launch Control Centre (Satish Dhawan Space Centre), instanceOf, spaceflight ground facility]
  • A. space launch facility
    A space launch facility is a specialized complex equipped with infrastructure, systems, and support services for preparing, launching, and sometimes recovering spacecraft and launch vehicles.
  • B. spaceport facility
    A spaceport facility is a complex of specialized infrastructure and services designed to support the launch, landing, maintenance, and logistical operations of spacecraft and their crews.
  • C. spaceflight center chosen
    A spaceflight center is a facility dedicated to the planning, development, testing, and control of spacecraft and space missions.
  • D. NASA spaceport
    A NASA spaceport is a specialized aerospace facility where NASA prepares, launches, and sometimes recovers spacecraft and launch vehicles for missions into space.
  • E. NASA rocket engine test facility
    A NASA rocket engine test facility is a specialized complex equipped with infrastructure, instrumentation, and safety systems to ground-test and validate rocket engines under controlled, flight-like conditions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381c4aa948190942e1d803143fb0e completed April 6, 2026, 9:49 a.m.
Created at: April 6, 2026, 12:25 p.m.