Triple

T1049410
Position Surface form Disambiguated ID Type / Status
Subject West Coast Main Line E22659 entity
Predicate operator P179 FINISHED
Object ScotRail E2216 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: ScotRail | Statement: [West Coast Main Line, operator, ScotRail]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: ScotRail
Context triple: [West Coast Main Line, operator, ScotRail]
  • A. ScotRail chosen
    ScotRail is the national train operating company in Scotland, providing most passenger rail services across the country.
  • B. Transport Scotland
    Transport Scotland is the national transport agency of the Scottish Government responsible for planning, funding, and managing Scotland’s trunk roads, rail, ferries, and other key transport infrastructure.
  • C. ScotRail Fife zone
    The ScotRail Fife zone is a designated fare area within Scotland’s Fife region used to set ticket prices and travel validity on ScotRail services.
  • D. Cumbernauld Line
    The Cumbernauld Line is a suburban railway route in central Scotland that connects the town of Cumbernauld with Glasgow and forms part of the regional commuter rail network.
  • E. Edinburgh Trams
    Edinburgh Trams is a modern light rail system in Edinburgh, Scotland, providing urban and suburban passenger transport across the city.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493da02e081908c13ff5e02a0fe7a completed March 1, 2026, 7:30 p.m.
NER Named-entity recognition batch_69a4b8b2c6208190b6fdf3e93b1b1d04 completed March 1, 2026, 10:07 p.m.
NED1 Entity disambiguation (via context triple) batch_69ac3bcd3a4481908f7d9f13e3697fa9 completed March 7, 2026, 2:53 p.m.
Created at: March 1, 2026, 7:42 p.m.