Triple

T10441607
Position Surface form Disambiguated ID Type / Status
Subject TGV inOui E246182 entity
Predicate ticketingSystem P3383 FINISHED
Object SNCF Connect E211385 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: SNCF Connect | Statement: [TGV inOui, ticketingSystem, SNCF Connect]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: SNCF Connect
Context triple: [TGV inOui, ticketingSystem, SNCF Connect]
  • A. SNCF Connect chosen
    SNCF Connect is the official digital platform and app of the French national railway company, providing online ticket booking, travel planning, and real-time information for trains and other transport services.
  • B. SNCF Voyageurs
    SNCF Voyageurs is the passenger rail operating division of France’s national railway company, responsible for running high-speed, regional, and commuter train services.
  • C. SNCF Réseau
    SNCF Réseau is the French state-owned rail infrastructure manager responsible for operating, maintaining, and developing France’s national railway network.
  • D. TGV Réseau
    TGV Réseau is a later-generation French high-speed trainset used by SNCF, designed for improved performance and comfort on the expanding TGV network.
  • E. SNCF
    SNCF is France’s national state-owned railway company, responsible for operating the country’s passenger and freight rail services and much of its rail infrastructure.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381c04fe08190957c26c526a3b05a completed April 6, 2026, 9:49 a.m.
NER Named-entity recognition batch_69d4fb9ebf488190ae776bd65e94cb00 completed April 7, 2026, 12:42 p.m.
NED1 Entity disambiguation (via context triple) batch_69d933a2daf481908300a12d0f794e4c completed April 10, 2026, 5:30 p.m.
Created at: April 6, 2026, 12:15 p.m.