Triple

T10417735
Position Surface form Disambiguated ID Type / Status
Subject Arsenal de Brest E245563 entity
Predicate instanceOf P0 FINISHED
Object military port C18743 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: military port
Context triple: [Arsenal de Brest, instanceOf, military port]
  • A. naval shore establishment chosen
    A naval shore establishment is a land-based facility that supports a navy’s operations, administration, training, logistics, and maintenance away from seagoing vessels.
  • B. fishing port
    A fishing port is a coastal harbor facility where fishing vessels dock to unload catches, refuel, maintain equipment, and support the commercial fishing industry through processing, storage, and distribution services.
  • C. former port facility
    A former port facility is a decommissioned maritime infrastructure area that once supported cargo or passenger shipping operations but is no longer used for its original port functions.
  • D. naval training base
    A naval training base is a dedicated military facility where naval personnel receive instruction, practice, and preparation in seamanship, warfare, and support operations.
  • E. port area
    A port area is a designated coastal or riverside zone equipped with infrastructure and facilities for the berthing, loading, unloading, storage, and transfer of cargo and passengers between land and water transport.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381be340c8190b05998703d42d224 completed April 6, 2026, 9:49 a.m.
Created at: April 6, 2026, 12:11 p.m.