Triple

T10296759
Position Surface form Disambiguated ID Type / Status
Subject Nihonbashi E241509 entity
Predicate bridgeCompleted P92972 FINISHED
Object 1911 (current stone Nihonbashi Bridge) LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1911 (current stone Nihonbashi Bridge) | Statement: [Nihonbashi, bridgeCompleted, 1911 (current stone Nihonbashi Bridge)]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: bridgeCompleted
Context triple: [Nihonbashi, bridgeCompleted, 1911 (current stone Nihonbashi Bridge)]
  • A. bridgeStatus
    Indicates the current operational condition or availability state of a bridge (e.g., open, closed, restricted).
  • B. bridgeName
    Indicates the designated name assigned to a specific bridge.
  • C. bridgeOpened
    Indicates that a bridge has transitioned from a closed or inactive state to being open and available for use.
  • D. bridgeUsed
    Indicates that a bridge is utilized or traversed by an entity to cross between two locations or points.
  • E. bridgeCarries
    Indicates that a bridge serves as a route or support structure for transporting or conveying something (such as vehicles, pedestrians, or utilities) across an obstacle.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381aaafc08190af475ef58dc16aba completed April 6, 2026, 9:49 a.m.
NER Named-entity recognition batch_69d4d2ebd258819099fadddcd13099fc completed April 7, 2026, 9:48 a.m.
PD Predicate disambiguation batch_69d4d1f35e548190be3b4d92d65d2d20 completed April 7, 2026, 9:44 a.m.
PDg Predicate description generation batch_69d4d29d7cf08190acd70cee634c5cdb completed April 7, 2026, 9:47 a.m.
Created at: April 6, 2026, 11:43 a.m.