Triple

T10243497
Position Surface form Disambiguated ID Type / Status
Subject Bóbr River E243656 entity
Predicate hasDam P8736 FINISHED
Object Sosnówka Dam E854537 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Sosnówka Dam | Statement: [Bóbr River, hasDam, Sosnówka Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Sosnówka Dam
Context triple: [Bóbr River, hasDam, Sosnówka Dam]
  • A. Rożnów Dam
    Rożnów Dam is a hydroelectric and flood-control dam on the Dunajec River in southern Poland, forming the artificial Rożnów Lake.
  • B. Pilchowice Dam
    Pilchowice Dam is a historic early 20th-century masonry gravity dam in southwestern Poland, notable for its large reservoir and role in regional flood control and hydroelectric power generation.
  • C. Niedzica Dam
    Niedzica Dam is a large hydroelectric and flood-control dam on the Dunajec River in southern Poland, known for forming the scenic Czorsztyn Lake and serving as a major regional tourist attraction.
  • D. Rzeszów Dam
    Rzeszów Dam is a hydraulic structure in southeastern Poland that creates the Rzeszów Reservoir on the Wisłok River, serving purposes such as water management, flood control, and recreation for the city of Rzeszów.
  • E. Wrzeszczyn Dam chosen
    Wrzeszczyn Dam is a hydroengineering structure on the Bóbr River in southwestern Poland, built to regulate water flow and support flood control and local water management.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381b0f97c819085c9b45799a5fb7c completed April 6, 2026, 9:49 a.m.
NER Named-entity recognition batch_69d4d22a76188190a73df23bfb08eb3d completed April 7, 2026, 9:45 a.m.
NED1 Entity disambiguation (via context triple) batch_69d74fea9c508190b92f7205424861cd completed April 9, 2026, 7:06 a.m.
Created at: April 6, 2026, 11:25 a.m.