Triple
T1024118
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hugh L. Carey Tunnel |
E22101
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | subaqueous tunnel |
C4139
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: subaqueous tunnel Context triple: [Hugh L. Carey Tunnel, instanceOf, subaqueous tunnel]
-
A.
road tunnel
chosen
A road tunnel is an underground or enclosed passageway constructed to allow vehicular traffic to pass through obstacles such as mountains, hills, or urban areas while maintaining a continuous roadway.
-
B.
roadway underpass
A roadway underpass is a structure that allows a road to pass beneath another road, railway, or obstacle, providing grade separation and uninterrupted traffic flow.
-
C.
aquanaut
An aquanaut is a person who lives and works underwater for extended periods, typically in submerged habitats or during long-duration diving missions, to conduct research, exploration, or technical tasks.
-
D.
bathyscaphe
A bathyscaphe is a self-propelled, deep-diving submersible vessel designed to explore and operate at extreme ocean depths.
-
E.
deep-submergence vehicle
A deep-submergence vehicle is a specialized, highly pressure-resistant underwater craft designed to operate at great ocean depths for exploration, research, inspection, or rescue missions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a493d6e380819097b384986ffc315c |
completed | March 1, 2026, 7:30 p.m. |
Created at: March 1, 2026, 7:41 p.m.