Triple

T10106821
Position Surface form Disambiguated ID Type / Status
Subject Vision Zero San Francisco E216342 entity
Predicate instanceOf P0 FINISHED
Object traffic safety initiative C2546 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: traffic safety initiative
Context triple: [Vision Zero San Francisco, instanceOf, traffic safety initiative]
  • A. roadway safety guideline
    A roadway safety guideline is a documented set of principles, rules, and recommended practices designed to minimize traffic-related risks and enhance the safety of all road users.
  • B. traffic authority
    A traffic authority is an organization or governmental body responsible for planning, regulating, and managing road use, traffic flow, and transportation safety within a specific jurisdiction.
  • C. road traffic agreement
    A road traffic agreement is a formal arrangement between parties—such as governments, municipalities, or private entities—that defines rights, responsibilities, and rules for the use, management, and regulation of road traffic within a specified area or network.
  • D. traffic management scheme
    A traffic management scheme is a coordinated set of policies, controls, and infrastructure measures designed to regulate and optimize the movement of vehicles, pedestrians, and goods within a transportation network.
  • E. health and safety initiative chosen
    A health and safety initiative is a coordinated program of policies, practices, and interventions designed to prevent injuries and illnesses, promote well-being, and ensure a safe environment for individuals in a specific setting or community.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83d039f08190b9d10363221c69fb completed March 30, 2026, 2:08 p.m.
Created at: March 30, 2026, 9:03 p.m.