Triple
T1008741
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lausanne–Geneva railway line |
E21771
|
entity |
| Predicate | partOfCorridor |
P840
|
FINISHED |
| Object |
Geneva–Lausanne–Bern–Zurich main line
The Geneva–Lausanne–Bern–Zurich main line is a major Swiss railway corridor that connects key cities across western and central Switzerland and forms part of the country’s primary east–west rail axis.
|
E133936
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Geneva–Lausanne–Bern–Zurich main line | Statement: [Lausanne–Geneva railway line, partOfCorridor, Geneva–Lausanne–Bern–Zurich main line]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Geneva–Lausanne–Bern–Zurich main line Context triple: [Lausanne–Geneva railway line, partOfCorridor, Geneva–Lausanne–Bern–Zurich main line]
-
A.
Lausanne–Geneva railway line
The Lausanne–Geneva railway line is a major Swiss rail corridor connecting the cities of Lausanne and Geneva along the northern shore of Lake Geneva, serving as a key route for both regional and international trains.
-
B.
Bern–Neuchâtel railway line
The Bern–Neuchâtel railway line is a key Swiss standard-gauge route connecting the federal city of Bern with Neuchâtel, serving both regional and intercity passenger traffic.
-
C.
Bern–Biel/Bienne railway line
The Bern–Biel/Bienne railway line is a major Swiss standard-gauge route connecting the capital city of Bern with the bilingual city of Biel/Bienne, serving as an important corridor for both regional and intercity passenger traffic.
-
D.
Bern–Lucerne railway line
The Bern–Lucerne railway line is a major Swiss rail route connecting the capital city of Bern with the central Swiss city of Lucerne, serving as an important corridor for both regional and intercity passenger traffic.
-
E.
Bern–Thun railway line
The Bern–Thun railway line is a key Swiss rail route connecting the capital city of Bern with the town of Thun, serving as an important corridor for both regional and long-distance passenger services.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Geneva–Lausanne–Bern–Zurich main line Triple: [Lausanne–Geneva railway line, partOfCorridor, Geneva–Lausanne–Bern–Zurich main line]
Generated description
The Geneva–Lausanne–Bern–Zurich main line is a major Swiss railway corridor that connects key cities across western and central Switzerland and forms part of the country’s primary east–west rail axis.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Geneva–Lausanne–Bern–Zurich main line Target entity description: The Geneva–Lausanne–Bern–Zurich main line is a major Swiss railway corridor that connects key cities across western and central Switzerland and forms part of the country’s primary east–west rail axis.
-
A.
Lausanne–Geneva railway line
The Lausanne–Geneva railway line is a major Swiss rail corridor connecting the cities of Lausanne and Geneva along the northern shore of Lake Geneva, serving as a key route for both regional and international trains.
-
B.
Bern–Neuchâtel railway line
The Bern–Neuchâtel railway line is a key Swiss standard-gauge route connecting the federal city of Bern with Neuchâtel, serving both regional and intercity passenger traffic.
-
C.
Bern–Biel/Bienne railway line
The Bern–Biel/Bienne railway line is a major Swiss standard-gauge route connecting the capital city of Bern with the bilingual city of Biel/Bienne, serving as an important corridor for both regional and intercity passenger traffic.
-
D.
Bern–Lucerne railway line
The Bern–Lucerne railway line is a major Swiss rail route connecting the capital city of Bern with the central Swiss city of Lucerne, serving as an important corridor for both regional and intercity passenger traffic.
-
E.
Bern–Thun railway line
The Bern–Thun railway line is a key Swiss rail route connecting the capital city of Bern with the town of Thun, serving as an important corridor for both regional and long-distance passenger services.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a493c53e648190ae8cb76c433fd9a7 |
completed | March 1, 2026, 7:30 p.m. |
| NER | Named-entity recognition | batch_69a4b7a2186c819081a495bc15f8c7fd |
completed | March 1, 2026, 10:03 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ac661d6d4c8190a72cd52ec2a27e12 |
completed | March 7, 2026, 5:53 p.m. |
| NEDg | Description generation | batch_69ac66c626e081909ffb74b5f05e5f18 |
completed | March 7, 2026, 5:56 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69ac673715388190862a8888ff60bd98 |
completed | March 7, 2026, 5:58 p.m. |
Created at: March 1, 2026, 7:41 p.m.