Triple
T1008723
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lausanne–Geneva railway line |
E21771
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | railway corridor |
C2952
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: railway corridor Context triple: [Lausanne–Geneva railway line, instanceOf, railway corridor]
-
A.
freight rail corridor
A freight rail corridor is a designated railway route primarily used for the efficient, high-capacity movement of goods and cargo between industrial, commercial, and logistics hubs.
-
B.
transport corridor
chosen
A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
-
C.
railway line
A railway line is a fixed transportation route consisting of tracks, signaling, and related infrastructure along which trains operate between defined locations.
-
D.
railroad line
A railroad line is a fixed route consisting of tracks and associated infrastructure over which trains operate to transport passengers or freight between locations.
-
E.
railway route
A railway route is a defined path or corridor along which trains operate between specified locations, following designated tracks, schedules, and operational rules.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a493c53e648190ae8cb76c433fd9a7 |
completed | March 1, 2026, 7:30 p.m. |
Created at: March 1, 2026, 7:41 p.m.