Triple

T10078434
Position Surface form Disambiguated ID Type / Status
Subject Kansas Highway 7 E213833 entity
Predicate connectsTo P845 FINISHED
Object U.S. Route 73 E485071 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Route 73 | Statement: [Kansas Highway 7, connectsTo, U.S. Route 73]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: U.S. Route 73
Context triple: [Kansas Highway 7, connectsTo, U.S. Route 73]
  • A. U.S. Route 73 chosen
    U.S. Route 73 is a north–south United States highway running through northeastern Kansas and southeastern Nebraska, connecting communities including the Kansas City metropolitan area.
  • B. U.S. Route 77
    U.S. Route 77 is a major north–south U.S. Highway running from the Mexican border in Texas through several central states to its northern terminus in Iowa.
  • C. U.S. Route 75
    U.S. Route 75 is a major north–south U.S. Highway running from Texas through the central United States, serving as a key transportation corridor for cities such as Dallas.
  • D. U.S. Route 72
    U.S. Route 72 is a major east–west U.S. highway in the southeastern United States that connects cities across Tennessee, Alabama, and Mississippi.
  • E. U.S. Route 83
    U.S. Route 83 is a major north–south United States highway that runs from the Mexican border in Texas to the Canadian border in North Dakota, traversing the Great Plains and connecting numerous rural communities and regional centers.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca839bf730819086900c323c9b8c95 completed March 30, 2026, 2:07 p.m.
NER Named-entity recognition batch_69cdd030a0fc819084b523e8e63636fa completed April 2, 2026, 2:10 a.m.
NED1 Entity disambiguation (via context triple) batch_69f75462fe9081908b939a1c6bdba6b9 completed May 3, 2026, 1:57 p.m.
Created at: March 30, 2026, 9 p.m.