Triple

T10071596
Position Surface form Disambiguated ID Type / Status
Subject São Francisco River E213640 entity
Predicate hasDam P8736 FINISHED
Object Sobradinho Dam
Sobradinho Dam is a large hydroelectric and flood-control dam on Brazil’s São Francisco River, notable for creating one of the world’s largest artificial reservoirs.
E840359 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Sobradinho Dam | Statement: [São Francisco River, hasDam, Sobradinho Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Sobradinho Dam
Context triple: [São Francisco River, hasDam, Sobradinho Dam]
  • A. Santo Antônio Dam
    Santo Antônio Dam is a large hydroelectric power plant in Brazil, built on the Madeira River near Porto Velho to generate electricity as part of the Madeira River energy complex.
  • B. Três Marias Dam
    Três Marias Dam is a large hydroelectric and flood-control dam in Brazil that forms one of the country’s major reservoirs on the São Francisco River.
  • C. São Simão Dam
    São Simão Dam is a large hydroelectric power facility in Brazil known for generating electricity and forming the São Simão Reservoir on the Paranaíba River.
  • D. Gouvães Dam
    Gouvães Dam is a hydroelectric dam in northern Portugal that forms part of the Tâmega River energy complex, contributing to regional power generation and water management.
  • E. Barra Bonita Dam
    Barra Bonita Dam is a hydroelectric and navigation dam complex in the state of São Paulo, Brazil, known for regulating the Tietê River and forming the Barra Bonita Reservoir.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Sobradinho Dam
Triple: [São Francisco River, hasDam, Sobradinho Dam]
Generated description
Sobradinho Dam is a large hydroelectric and flood-control dam on Brazil’s São Francisco River, notable for creating one of the world’s largest artificial reservoirs.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Sobradinho Dam
Target entity description: Sobradinho Dam is a large hydroelectric and flood-control dam on Brazil’s São Francisco River, notable for creating one of the world’s largest artificial reservoirs.
  • A. Santo Antônio Dam
    Santo Antônio Dam is a large hydroelectric power plant in Brazil, built on the Madeira River near Porto Velho to generate electricity as part of the Madeira River energy complex.
  • B. Três Marias Dam
    Três Marias Dam is a large hydroelectric and flood-control dam in Brazil that forms one of the country’s major reservoirs on the São Francisco River.
  • C. São Simão Dam
    São Simão Dam is a large hydroelectric power facility in Brazil known for generating electricity and forming the São Simão Reservoir on the Paranaíba River.
  • D. Gouvães Dam
    Gouvães Dam is a hydroelectric dam in northern Portugal that forms part of the Tâmega River energy complex, contributing to regional power generation and water management.
  • E. Barra Bonita Dam
    Barra Bonita Dam is a hydroelectric and navigation dam complex in the state of São Paulo, Brazil, known for regulating the Tietê River and forming the Barra Bonita Reservoir.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca839add308190b57d53b4ec21f2d0 completed March 30, 2026, 2:07 p.m.
NER Named-entity recognition batch_69cdd01279388190b94c8def00425c78 completed April 2, 2026, 2:10 a.m.
NED1 Entity disambiguation (via context triple) batch_69d2b63d13fc8190bdeac3c7b2529052 completed April 5, 2026, 7:21 p.m.
NEDg Description generation batch_69d2b78f3c248190b104937e2d669882 completed April 5, 2026, 7:27 p.m.
NED2 Entity disambiguation (via description) batch_69d2b84a26a481908ab2705d5883cfce completed April 5, 2026, 7:30 p.m.
Created at: March 30, 2026, 8:59 p.m.