Triple

T10039157
Position Surface form Disambiguated ID Type / Status
Subject Islamic Revolutionary Guard Corps E205249 entity
Predicate hasEconomicArm P3410 FINISHED
Object Khatam al-Anbiya Construction Headquarters E837228 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Khatam al-Anbiya Construction Headquarters | Statement: [Islamic Revolutionary Guard Corps, hasEconomicArm, Khatam al-Anbiya Construction Headquarters]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Khatam al-Anbiya Construction Headquarters
Context triple: [Islamic Revolutionary Guard Corps, hasEconomicArm, Khatam al-Anbiya Construction Headquarters]
  • A. Khatam al-Anbiya Construction Headquarters chosen
    Khatam al-Anbiya Construction Headquarters is a major engineering and construction conglomerate controlled by Iran’s Islamic Revolutionary Guard Corps, heavily involved in large-scale infrastructure, energy, and industrial projects.
  • B. Al Faisaliah Tower
    Al Faisaliah Tower is a prominent skyscraper in Riyadh, Saudi Arabia, known for its distinctive tapered design topped with a glass sphere and its role as a major commercial and business landmark.
  • C. Nassif Building
    The Nassif Building is a prominent federal office building in Washington, D.C., best known for long serving as the main headquarters of the U.S. Department of Transportation.
  • D. Sheikh Bahaei Building
    Sheikh Bahaei Building is a notable cultural venue in Tehran that houses the Museum of Hossein Behzad, dedicated to the renowned Iranian miniature painter.
  • E. Qibli Mosque building
    The Qibli Mosque building is the southern prayer hall within Jerusalem’s Al-Aqsa Mosque compound, serving as one of the principal congregational mosques in the Noble Sanctuary.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasEconomicArm
Context triple: [Islamic Revolutionary Guard Corps, hasEconomicArm, Khatam al-Anbiya Construction Headquarters]
  • A. hasEconomicOrganization chosen
    Indicates that an entity possesses, is associated with, or participates in a specific economic organization or institutional economic structure.
  • B. hasEconomicFocus
    Indicates that an entity is primarily concerned with, oriented toward, or specializing in economic matters, activities, or impacts.
  • C. hasEconomicDimension
    Indicates that something involves, affects, or is characterized by economic factors, considerations, or consequences.
  • D. hasEconomicPosition
    Indicates that an entity holds a particular role, status, or standing within an economic system or structure.
  • E. hasEconomicRole
    Indicates that an entity participates in or fulfills a specific function, position, or responsibility within an economic system or activity.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca834f70e88190b2d74828b7767ec1 completed March 30, 2026, 2:06 p.m.
NER Named-entity recognition batch_69cdcee186708190bc9fecd637b4f7e6 completed April 2, 2026, 2:05 a.m.
NED1 Entity disambiguation (via context triple) batch_69d29a2cbdd08190b1ef7602ad160114 completed April 5, 2026, 5:21 p.m.
PD Predicate disambiguation batch_69cd4b8638508190b22acc65500ec7d6 completed April 1, 2026, 4:44 p.m.
Created at: March 30, 2026, 8:55 p.m.