Triple

T10028806
Position Surface form Disambiguated ID Type / Status
Subject Gyeongbu Line E204798 entity
Predicate usedByService P1294 FINISHED
Object ITX-Saemaeul E190965 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: ITX-Saemaeul | Statement: [Gyeongbu Line, usedByService, ITX-Saemaeul]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: ITX-Saemaeul
Context triple: [Gyeongbu Line, usedByService, ITX-Saemaeul]
  • A. ITX-Saemaeul chosen
    ITX-Saemaeul is a class of South Korean intercity express trains operated by Korail, offering faster and more comfortable service than conventional trains on major routes.
  • B. ITX-Cheongchun
    ITX-Cheongchun is a South Korean intercity express train service connecting Seoul with major regional cities, designed to offer faster and more comfortable travel for young and general passengers alike.
  • C. KTX-Eum
    KTX-Eum is a South Korean high-speed electric multiple unit train operated by Korail, designed for intercity services on the country’s high-speed rail network.
  • D. KTX
    KTX is South Korea’s high-speed rail service that connects major cities such as Seoul and Busan.
  • E. Saemaeul-ho express
    Saemaeul-ho express was a long-distance passenger train service in South Korea that operated as one of the country’s primary intercity rail options before being succeeded by the ITX-Saemaeul.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca834d77188190ad645e33e8ca3200 completed March 30, 2026, 2:06 p.m.
NER Named-entity recognition batch_69cdcde51c408190afb34010b1707014 completed April 2, 2026, 2:01 a.m.
NED1 Entity disambiguation (via context triple) batch_69d282351ebc8190b22bf3964823b0ee completed April 5, 2026, 3:39 p.m.
Created at: March 30, 2026, 8:54 p.m.