Triple

T10027300
Position Surface form Disambiguated ID Type / Status
Subject Grammy Award for Best Engineered Album, Non-Classical E200762 entity
Predicate instanceOf P0 FINISHED
Object recording engineering award C27313 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: recording engineering award
Context triple: [Grammy Award for Best Engineered Album, Non-Classical, instanceOf, recording engineering award]
  • A. Q Awards category
    A Q Awards category is a specific classification used to group and recognize particular types of musical achievements or contributions within the Q Awards ceremony.
  • B. Emmy Award category
    An Emmy Award category is a specific classification used to group and recognize excellence in particular types of television programming, roles, or technical achievements within the Emmy Awards.
  • C. Annie Award category
    An Annie Award category is a specific classification within the Annie Awards that groups and recognizes achievements in a particular area of animation, such as character animation, direction, or feature production.
  • D. American Music Award category
    An American Music Award category is a specific classification used to group and recognize artists, songs, or albums based on genre, performance type, or achievement within the American Music Awards.
  • E. International Emmy Award
    The International Emmy Award is a prestigious accolade presented annually by the International Academy of Television Arts & Sciences to recognize excellence in television programming produced and initially aired outside the United States.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca831c45f08190ac1505cc15076608 completed March 30, 2026, 2:05 p.m.
Created at: March 30, 2026, 8:54 p.m.