Triple

T10001027
Position Surface form Disambiguated ID Type / Status
Subject Lorton station E197325 entity
Predicate instanceOf P0 FINISHED
Object train ferry terminal C564 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: train ferry terminal
Context triple: [Lorton station, instanceOf, train ferry terminal]
  • A. ferry terminal
    A ferry terminal is a designated facility where passengers and vehicles embark and disembark from ferries, typically providing ticketing, waiting areas, and docking infrastructure.
  • B. auto ferry train
    An auto ferry train is a specialized rail service designed to transport passengers along with their vehicles—such as cars, motorcycles, and small trucks—across long distances or through otherwise impassable routes like tunnels or mountainous regions.
  • C. train station chosen
    A train station is a designated facility where trains regularly stop to pick up and drop off passengers and sometimes freight, typically featuring platforms, ticketing services, and waiting areas.
  • D. tram station
    A tram station is a designated stopping place along a tram line where passengers can safely board, alight, and sometimes transfer between tram services.
  • E. railway bridge terminus
    A railway bridge terminus is the endpoint of a rail line where tracks transition from or onto a bridge structure, often incorporating platforms, signaling, and facilities for train arrival, departure, and turnaround.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82f3b61c81908ecc2c1c96dbc2e4 completed March 30, 2026, 2:04 p.m.
Created at: March 30, 2026, 8:51 p.m.