unit2Commissioned
P52113
predicate
Indicates that a second unit has been formally placed into active service or operation.
All labels observed (4)
| Label | Occurrences |
|---|---|
| unit2Commissioned canonical | 2 |
| additionalUnitCommissioned | 1 |
| commissionedUnit1 | 1 |
| commissionedUnit2 | 1 |
Description generation (PDg)
The one-sentence description above was generated by prompting gpt-5.1 with the predicate name and this instruction.
Instruction
Given a predicate that represents a relationship or action between entities, generate a one-sentence description explaining its meaning. # Instructions Focus on describing the relationship, not the entities themselves. # Response Format Begin the description with \' Indicates...\'
Input
Predicate: unit2Commissioned
Generated description
Indicates that a second unit has been formally placed into active service or operation.
Sample triples (5)
| Subject | Object |
|---|---|
| Calvert Cliffs Nuclear Power Plant | 1977 ⓘ |
| Revelstoke Dam | 2010 via predicate surface "additionalUnitCommissioned" ⓘ |
|
Madras Atomic Power Station at Kalpakkam
surface form:
Madras Atomic Power Station
|
1984 via predicate surface "commissionedUnit1" ⓘ |
|
Madras Atomic Power Station at Kalpakkam
surface form:
Madras Atomic Power Station
|
1986 via predicate surface "commissionedUnit2" ⓘ |
| Rivne Nuclear Power Plant | 1981 ⓘ |