unit2Commissioned

P52113
predicate

Indicates that a second unit has been formally placed into active service or operation.

All labels observed (4)

Label Occurrences
unit2Commissioned canonical 2
additionalUnitCommissioned 1
commissionedUnit1 1

Description generation (PDg)

The one-sentence description above was generated by prompting gpt-5.1 with the predicate name and this instruction.

Instruction
Given a predicate that represents a relationship or action between entities, generate a one-sentence description explaining its meaning.  
# Instructions
Focus on describing the relationship, not the entities themselves. 
# Response Format
Begin the description with \' Indicates...\'
Input
Predicate: unit2Commissioned
Generated description
Indicates that a second unit has been formally placed into active service or operation.

Sample triples (5)

Subject Object
Calvert Cliffs Nuclear Power Plant 1977
Revelstoke Dam 2010 via predicate surface "additionalUnitCommissioned"
Madras Atomic Power Station at Kalpakkam
surface form: Madras Atomic Power Station
1984 via predicate surface "commissionedUnit1"
Madras Atomic Power Station at Kalpakkam
surface form: Madras Atomic Power Station
1986 via predicate surface "commissionedUnit2"
Rivne Nuclear Power Plant 1981