typicalCompletionTimeInWeeks
P42200
predicate
Indicates the usual number of weeks it takes to complete the associated task, process, or activity.
All labels observed (4)
| Label | Occurrences |
|---|---|
| typicalTreatmentDuration | 5 |
| typicalCompletionTimeInWeeks canonical | 3 |
| typicalCuringTime | 1 |
| typicalIncubationTimeForM_tuberculosis | 1 |
Description generation (PDg)
The one-sentence description above was generated by prompting gpt-5.1 with the predicate name and this instruction.
Instruction
Given a predicate that represents a relationship or action between entities, generate a one-sentence description explaining its meaning. # Instructions Focus on describing the relationship, not the entities themselves. # Response Format Begin the description with \' Indicates...\'
Input
Predicate: typicalCompletionTimeInWeeks
Generated description
Indicates the usual number of weeks it takes to complete the associated task, process, or activity.
Sample triples (10)
| Subject | Object |
|---|---|
| GR10 long-distance footpath | 6 ⓘ |
| GR10 long-distance footpath | 8 ⓘ |
| Black Forest ham | several weeks via predicate surface "typicalCuringTime" ⓘ |
| Middlebrook 7H10 agar | 2–4 weeks via predicate surface "typicalIncubationTimeForM_tuberculosis" ⓘ |
| HRP | 6 ⓘ |
|
velpatasvir
surface form:
Velpatasvir
|
12 weeks via predicate surface "typicalTreatmentDuration" ⓘ |
| Harvoni | 8 weeks via predicate surface "typicalTreatmentDuration" ⓘ |
| Harvoni | 12 weeks via predicate surface "typicalTreatmentDuration" ⓘ |
| Harvoni | 24 weeks via predicate surface "typicalTreatmentDuration" ⓘ |
| Epclusa | 12 weeks via predicate surface "typicalTreatmentDuration" ⓘ |