U. S. Army's Future Vertical Lift program

GPTKB entity

Statements (57)
Predicate Object
gptkbp:instance_of gptkb:military_training
gptkbp:addresses future battlefield requirements
gptkbp:aims_to greater agility in operations
greater mission success
improved speed and range
increase operational capabilities
gptkbp:can autonomous flight capabilities
gptkbp:can_be_used_to advanced materials
gptkbp:can_include gptkb:advanced_propulsion_systems
gptkbp:can_provide increased firepower
gptkbp:collaborates_with defense contractors
gptkbp:developed_by collaboration with other military branches
gptkbp:enhances crew safety
logistics and supply chain operations
force protection measures
interoperability with other forces
intelligence, surveillance, and reconnaissance capabilities
combat support capabilities
survivability of aircraft
gptkbp:facilitates joint training exercises
gptkbp:focus rapid deployment capabilities
advanced rotorcraft technology
gptkbp:focuses_on vertical lift capabilities
gptkbp:goal develop next-generation vertical lift aircraft
https://www.w3.org/2000/01/rdf-schema#label U. S. Army's Future Vertical Lift program
gptkbp:include greater situational awareness
gptkbp:includes gptkb:technology_demonstrations
manned and unmanned systems
gptkbp:integration cutting-edge technologies
gptkbp:involves multiple aircraft designs
gptkbp:is_aimed_at enhancing mission flexibility
gptkbp:is_anticipated_by enter service in the 2030s
gptkbp:is_anticipated_to_enhance combat effectiveness
gptkbp:is_designed_to enhance troop transport capabilities
gptkbp:is_expected_to replace aging helicopter fleet
gptkbp:is_expected_to_leverage artificial intelligence technologies
gptkbp:is_focused_on sustainability in operations
gptkbp:is_funded_by gptkb:U._S._Department_of_Defense
gptkbp:is_incorporated_in next-gen avionics systems
gptkbp:is_influenced_by technological advancements in aviation
lessons learned from past conflicts
gptkbp:is_part_of Army modernization strategy
the U. S. Army's modernization efforts
Army Aviation modernization efforts
Joint Multi-Role program
the Army's aviation strategy
the Army's future vision for aviation
the Future Vertical Lift initiative
gptkbp:is_sought_after_by reduce maintenance costs
gptkbp:operates_in contested environments
gptkbp:reduces response times in combat
gptkbp:support joint operations with allies
gptkbp:supports multi-domain operations
gptkbp:was_a_response_to emerging threats
gptkbp:will_aim_to_achieve reduced noise signatures
gptkbp:bfsParent gptkb:UH-60_M
gptkbp:bfsLayer 6