Statements (92)
Predicate | Object |
---|---|
gptkbp:instanceOf |
Space Shuttle
|
gptkbp:communicationEquipment |
S-band
|
gptkbp:crew |
astronauts
NASA_Astronaut_Training NASA_training_programs |
gptkbp:crewCapacity |
7
|
gptkbp:dataBusWidth |
4.6 meters
|
gptkbp:decommissioned |
2011
|
gptkbp:diedIn |
Environmental Control System
|
gptkbp:environmentalImpact |
gptkb:Reinforced_Carbon-Carbon
|
gptkbp:exhibits |
Kennedy Space Center Visitor Complex
|
gptkbp:finalDisposal |
Kennedy Space Center Visitor Complex
|
gptkbp:firstAwarded |
1985-10-07
|
gptkbp:firstCommandingOfficer |
gptkb:Eileen_Collins
|
gptkbp:firstFlight |
33
2011-07-08 1985-10-03 |
gptkbp:floors |
307 days
|
gptkbp:hasGoals |
2
|
gptkbp:hasLength |
18.3 meters
|
gptkbp:height |
3.7 meters
17.2 meters |
https://www.w3.org/2000/01/rdf-schema#label |
The space shuttle Atlantis
|
gptkbp:launchDate |
1985-10-03
|
gptkbp:launched |
T-31 hours
|
gptkbp:launchSite |
gptkb:Kennedy_Space_Center
|
gptkbp:launchVehicle |
Space Shuttle
Space Shuttle Launch System |
gptkbp:length |
37.2 meters
|
gptkbp:mainEvent |
3
|
gptkbp:manufacturer |
NASA
|
gptkbp:maxTakeoffWeight |
2,030,000 pounds
|
gptkbp:missions |
Fly-by-wire
|
gptkbp:navigationEquipment |
Inertial Navigation System
|
gptkbp:notableFeature |
gptkb:RCS_thrusters
gptkb:STS-1 Retractable landing gear STS-135 Communication system Launch escape system Flight control system Environmental control system Electrical power system Crew escape system 2011-07-21 Landing gear system Orbital docking system Orbital maneuvering system Thermal protection system Crew access arm Crew cabin Fuel cell system Main engine nozzle Main propulsion system Orbital maneuvering system engines Solid rocket booster separation system Thermal protection tiles Navigation_system Hubble_Space_Telescope_servicing_missions Avionics_system Payload_bay_doors Payload_bay_lights Payload_handling_system |
gptkbp:operationalStatus |
retired
|
gptkbp:orbitalInclination |
Low Earth Orbit
51.6 degrees 28.5 degrees 200 to 400 kilometers NASA_missions |
gptkbp:payloadCapacity |
15.2 meters
28,000 kg 28,000 kilograms 14,000 kilograms |
gptkbp:powers |
Fuel Cells
|
gptkbp:primaryMission |
gptkb:International_Space_Station
|
gptkbp:productionYears |
26 years
|
gptkbp:renovated |
parachutes
|
gptkbp:retirementYear |
2011-07-21
|
gptkbp:secondaryMission |
gptkb:STS-51-J
29 4 2011-07-08 STS-135 1985-10-03 |
gptkbp:secondaryRole |
satellites
science experiments |
gptkbp:significantEvent |
International_Space_Station_construction
|
gptkbp:status |
Retired
|
gptkbp:takeoffDistance |
220 knots
|
gptkbp:totalGoals |
4,848
|
gptkbp:width |
4.6 meters
|
gptkbp:wingspan |
23.8 meters
|