The Hong Kong-Zhuhai-Macau Bridge
GPTKB entity
Statements (52)
Predicate | Object |
---|---|
gptkbp:instanceOf |
bridge
|
gptkbp:access |
gptkb:Hong_Kong_Port
gptkb:Zhuhai_Port Macau Port |
gptkbp:built |
9 years
December 15, 2009 Prefabricated_segments |
gptkbp:connects |
gptkb:Hong_Kong
gptkb:Zhuhai Macau |
gptkbp:cultural_significance |
Engineering marvel
Symbol of cooperation |
gptkbp:design |
Cable-stayed bridge
|
gptkbp:environmental_impact |
Significant
|
gptkbp:features |
Artificial islands
Undersea tunnels |
gptkbp:future_plans |
Expansion projects
Increased capacity |
gptkbp:height |
40 meters
|
https://www.w3.org/2000/01/rdf-schema#label |
The Hong Kong-Zhuhai-Macau Bridge
|
gptkbp:is_designed_to |
gptkb:China_Road_and_Bridge_Corporation
AECOM |
gptkbp:length |
55 kilometers
|
gptkbp:location |
gptkb:Hong_Kong
gptkb:Zhuhai Macau |
gptkbp:maintenance |
Regular inspections
Repairs |
gptkbp:nearby_attractions |
Yes
|
gptkbp:offers |
$20 billion
|
gptkbp:opened |
October 24, 2018
|
gptkbp:operator |
gptkb:Hong_Kong-Zhuhai-Macau_Bridge_Authority
|
gptkbp:passenger_traffic |
vehicles
taxis buses trucks 6 lanes |
gptkbp:productLine |
1,500 meters
|
gptkbp:provides_access_to |
October 24, 2018
|
gptkbp:safety_features |
Lighting systems
Emergency lanes Traffic monitoring systems |
gptkbp:significance |
Regional development
Tourism Economic integration |
gptkbp:sustainability_initiatives |
Environmental assessments
Pollution control measures Wildlife protection measures |
gptkbp:toll |
Electronic toll collection
Varies by vehicle type |
gptkbp:type |
toll bridge
|
gptkbp:visitors |
Designated areas
|