The Berbice Bridge

GPTKB entity

Statements (57)
Predicate Object
gptkbp:instanceOf bridge
gptkbp:accessibility improved access to rural areas
gptkbp:averageTemperature steel cables
gptkbp:built 2 years
2006
2008
incremental launching
design and construction complexities
flooding and logistics
gptkbp:community_engagement consultations held
gptkbp:community_impact enhanced connectivity
gptkbp:connects gptkb:New_Amsterdam
Rosignol
gptkbp:construction_cost $45 million
gptkbp:crosses gptkb:Berbice_River
gptkbp:cultural_significance symbol of progress
gptkbp:design 50 years
cable-stayed
D._A._M._Engineering
gptkbp:emergencyServices available
reduced for local communities
gptkbp:environmental_impact studies conducted
gptkbp:features pedestrian walkway
gptkbp:feedback considered in operations.
gptkbp:firstDeployment created jobs during construction
gptkbp:future_plans expansion considerations
gptkbp:hasCharacter ongoing efforts
modern design
regular safety audits
fixed bridge
gptkbp:height 30 meters
https://www.w3.org/2000/01/rdf-schema#label The Berbice Bridge
gptkbp:impact economic development in the region
gptkbp:length 1,200 meters
gptkbp:localBusiness boosted local economy
gptkbp:localGovernment involved in planning
gptkbp:location gptkb:Guyana
gptkbp:maintenance regular inspections
Berbice_Bridge_Company_Inc.
gptkbp:opened 2008
gptkbp:owner Berbice_Bridge_Company_Inc.
gptkbp:passenger_traffic vehicles
motor vehicles
implemented measures
approximately 1,000 vehicles per day
gptkbp:productionCompany China_Railway_First_Group
gptkbp:public_perception generally positive
gptkbp:public_transport_access buses and taxis
gptkbp:region key transport link
gptkbp:sacraments attended_by_President_Bharrat_Jagdeo
gptkbp:safety_features lighting and barriers
gptkbp:scholarships public-private partnership
gptkbp:significance first bridge over the Berbice River
gptkbp:toll yes
gptkbp:tourism increased tourism opportunities
gptkbp:type cable-stayed bridge
gptkbp:weight 40 tons