Teles Pires Hydroelectric Plant

GPTKB entity

Statements (64)
Predicate Object
gptkbp:instance_of gptkb:hydroelectric_power_generation
gptkbp:capacity 1,820 MW
gptkbp:climate_resilience_measures adopted
gptkbp:community_engagement ongoing
gptkbp:community_involvement established
gptkbp:community_partnerships established
gptkbp:construction_cost R$ 6 billion
gptkbp:construction_method conventional
gptkbp:construction_started gptkb:2010
gptkb:2015
gptkbp:country gptkb:Brazil
gptkbp:dam_type gravity dam
gptkbp:developer gptkb:Eletrobras
gptkbp:electrification gptkb:Eletrobras
hydropower
gptkbp:emergency_services developed
gptkbp:emissions_standard gptkb:significant
gptkbp:employs local
gptkbp:energy_efficiency_measures implemented
gptkbp:energy_security_contribution gptkb:significant
gptkbp:environmental_impact completed
gptkbp:expansion_plans under consideration
gptkbp:fishing_impact monitored
gptkbp:flood_control 1,200 km²
gptkbp:funding public and private
gptkbp:grid_position National Interconnected System
gptkbp:grid_stability_contribution notable
gptkbp:height 70 m
1,200 m
https://www.w3.org/2000/01/rdf-schema#label Teles Pires Hydroelectric Plant
gptkbp:impact_assessment_reports published
gptkbp:impact_on_local_ecosystem gptkb:significant
gptkbp:interconnection_with_other_plants planned
gptkbp:is_monitored_by regularly conducted
gptkbp:location gptkb:Brazil
gptkbp:occurs_annually 6,000 GWh
gptkbp:operational_since gptkb:2015
gptkbp:operator gptkb:Eletrobras
gptkbp:owner gptkb:Eletrobras
gptkbp:power_source hydropower
gptkbp:public_awareness ongoing
gptkbp:regional_economic_impact positive
gptkbp:regulatory_compliance ensured
obtained
gptkbp:research_opportunities available
gptkbp:reservoir gptkb:Teles_Pires_River
1,200 km²
gptkbp:river gptkb:Teles_Pires
gptkbp:safety_measures in place
gptkbp:socio_economic_studies conducted
gptkbp:stakeholders active
gptkbp:sustainability high
gptkbp:sustainability_practices implemented
gptkbp:tourism high
gptkbp:transportation in place
gptkbp:turbine_type gptkb:6
Francis turbine
300 MW
gptkbp:type run-of-the-river
gptkbp:water_quality conducted
gptkbp:water_requirement 3,000,000 m³
gptkbp:year_created gptkb:2015
gptkbp:bfsParent gptkb:Teles_Pires_River
gptkbp:bfsLayer 6