Taiyuan–Zhangjiakou high-speed railway
GPTKB entity
Statements (58)
Predicate | Object |
---|---|
gptkbp:instanceOf |
high-speed railway
|
gptkbp:accessibility |
wheelchair access
|
gptkbp:bicycleParking |
allowed on certain trains
|
gptkbp:built |
gptkb:China_Railway_Group_Limited
geological conditions completed in 4 years |
gptkbp:communityEngagement |
involves local stakeholders
|
gptkbp:constructionMaterial |
2020
high-strength concrete |
gptkbp:constructionStarted |
2016
|
gptkbp:culturalSignificance |
promotes tourism in the region
|
gptkbp:design |
aerodynamic train design
|
gptkbp:drivetrain |
operates until late evening
departed on December 30, 2020 |
gptkbp:economicImpact |
stimulates local businesses
|
gptkbp:electrification |
25 kV AC
|
gptkbp:emergencyServices |
established safety measures
|
gptkbp:endsAt |
gptkb:Zhangjiakou
|
gptkbp:environmentalImpact |
reduces carbon emissions
designed to minimize ecological disruption |
gptkbp:funding |
government and private investment
|
gptkbp:futurePlans |
expansion to other cities
planned_to_extend_to_Beijing |
https://www.w3.org/2000/01/rdf-schema#label |
Taiyuan–Zhangjiakou high-speed railway
|
gptkbp:impact |
boosts regional economy
|
gptkbp:length |
approximately 300 km
|
gptkbp:location |
gptkb:China
|
gptkbp:maintenance |
regular inspections and upgrades
|
gptkbp:majorStations |
Datong,_Zhangjiakou,_Taiyuan
|
gptkbp:maxSpeed |
350 km/h
|
gptkbp:numberOfStations |
6
|
gptkbp:opened |
2020
|
gptkbp:operator |
gptkb:China_Railway_High-speed
|
gptkbp:originalNetwork |
gptkb:China's_high-speed_rail_network
|
gptkbp:owner |
gptkb:China_Railway_Corporation
|
gptkbp:passengerCapacity |
generally positive reviews
modern amenities up to 10 million annually |
gptkbp:performances |
350 km/h
|
gptkbp:project |
approximately 50 billion yuan
|
gptkbp:publicTransport |
connects with local transit systems
|
gptkbp:region |
links to other high-speed lines
|
gptkbp:route |
Taiyuan_to_Zhangjiakou
|
gptkbp:safetyFeatures |
advanced signaling systems
|
gptkbp:services |
every 30 minutes
available on board introduction of smart ticketing |
gptkbp:serviceStartDate |
December 30, 2020
|
gptkbp:serviceType |
intercity service
|
gptkbp:significance |
connects_Shanxi_and_Hebei_provinces
|
gptkbp:startsAt |
gptkb:Taiyuan
|
gptkbp:sustainabilityInitiatives |
eco-friendly construction practices
|
gptkbp:technology |
modern rail technology
|
gptkbp:ticket_sales |
varies by class
|
gptkbp:track |
1435 mm
|
gptkbp:trainTypes |
passenger railway
|
gptkbp:travelTime |
about 1.5 hours
|
gptkbp:wifiAvailability |
free wifi on trains
|