Statements (62)
Predicate | Object |
---|---|
gptkbp:instanceOf |
tunnel
|
gptkbp:benefits |
urban drainage
|
gptkbp:built |
7 years
geological conditions |
gptkbp:climate |
part of strategy
|
gptkbp:collaborations |
local authorities
with environmental groups with international experts |
gptkbp:communityEngagement |
involved local residents
|
gptkbp:communityFeedback |
considered in operations
|
gptkbp:communityImpact |
positive
|
gptkbp:communitySupport |
gained during planning
|
gptkbp:connects |
gptkb:Túnel_Emisor_a_la_Ciudad_de_México
|
gptkbp:constructionMaterial |
2015
cut and cover |
gptkbp:constructionStarted |
2008
|
gptkbp:designedBy |
Grupo de Consultoría de Ingeniería
|
gptkbp:diameter |
5.5 meters
|
gptkbp:drainageBasin |
monitored continuously
|
gptkbp:electronicSystems |
utilized advanced techniques
tunneling under urban areas |
gptkbp:emergencyServices |
improved
enhanced |
gptkbp:emissionsStandard |
met during construction
|
gptkbp:environmentalImpact |
followed during construction
mitigated flooding |
gptkbp:futurePlans |
expansion possible
planned for efficiency |
gptkbp:hasAuthorityOver |
gptkb:Comisión_Nacional_del_Agua
|
gptkbp:hasFunding |
secured for project
|
gptkbp:highestPoint |
gptkb:Río_de_los_Remedios
|
gptkbp:historicalSignificance |
modern engineering feat
|
https://www.w3.org/2000/01/rdf-schema#label |
Túnel Emisor Oriente
|
gptkbp:impact |
significant reduction
conducted pre-construction |
gptkbp:infrastructure |
civil engineering project
|
gptkbp:is_funded_by |
gptkb:government_of_Mexico
|
gptkbp:is_monitored_by |
installed
|
gptkbp:length |
over 62 kilometers
|
gptkbp:localEconomy |
positively affected
|
gptkbp:location |
gptkb:Mexico
|
gptkbp:maintenance |
required periodically
|
gptkbp:operationalStatus |
2015
|
gptkbp:partOf |
Mexico_City_drainage_system
|
gptkbp:project |
approximately 1 billion USD
reduce urban flooding delayed due to challenges handled by government agencies |
gptkbp:publicAccess |
no
campaigns conducted |
gptkbp:purpose |
drainage
|
gptkbp:reduces |
flood risk
|
gptkbp:region |
critical for drainage
|
gptkbp:regulatoryCompliance |
adhered to standards
|
gptkbp:relatedTo |
flood control
|
gptkbp:safetyFeatures |
implemented during construction
|
gptkbp:serves |
gptkb:Mexico_City
|
gptkbp:sustainability |
considered in design
|
gptkbp:type |
gravity tunnel
|
gptkbp:waterManagement |
integrated approach
|
gptkbp:waterQuality |
monitored
150 cubic meters per second |