Túnel Emisor Oriente

GPTKB entity

Statements (62)
Predicate Object
gptkbp:instanceOf tunnel
gptkbp:benefits urban drainage
gptkbp:built 7 years
geological conditions
gptkbp:climate part of strategy
gptkbp:collaborations local authorities
with environmental groups
with international experts
gptkbp:communityEngagement involved local residents
gptkbp:communityFeedback considered in operations
gptkbp:communityImpact positive
gptkbp:communitySupport gained during planning
gptkbp:connects gptkb:Túnel_Emisor_a_la_Ciudad_de_México
gptkbp:constructionMaterial 2015
cut and cover
gptkbp:constructionStarted 2008
gptkbp:designedBy Grupo de Consultoría de Ingeniería
gptkbp:diameter 5.5 meters
gptkbp:drainageBasin monitored continuously
gptkbp:electronicSystems utilized advanced techniques
tunneling under urban areas
gptkbp:emergencyServices improved
enhanced
gptkbp:emissionsStandard met during construction
gptkbp:environmentalImpact followed during construction
mitigated flooding
gptkbp:futurePlans expansion possible
planned for efficiency
gptkbp:hasAuthorityOver gptkb:Comisión_Nacional_del_Agua
gptkbp:hasFunding secured for project
gptkbp:highestPoint gptkb:Río_de_los_Remedios
gptkbp:historicalSignificance modern engineering feat
https://www.w3.org/2000/01/rdf-schema#label Túnel Emisor Oriente
gptkbp:impact significant reduction
conducted pre-construction
gptkbp:infrastructure civil engineering project
gptkbp:is_funded_by gptkb:government_of_Mexico
gptkbp:is_monitored_by installed
gptkbp:length over 62 kilometers
gptkbp:localEconomy positively affected
gptkbp:location gptkb:Mexico
gptkbp:maintenance required periodically
gptkbp:operationalStatus 2015
gptkbp:partOf Mexico_City_drainage_system
gptkbp:project approximately 1 billion USD
reduce urban flooding
delayed due to challenges
handled by government agencies
gptkbp:publicAccess no
campaigns conducted
gptkbp:purpose drainage
gptkbp:reduces flood risk
gptkbp:region critical for drainage
gptkbp:regulatoryCompliance adhered to standards
gptkbp:relatedTo flood control
gptkbp:safetyFeatures implemented during construction
gptkbp:serves gptkb:Mexico_City
gptkbp:sustainability considered in design
gptkbp:type gravity tunnel
gptkbp:waterManagement integrated approach
gptkbp:waterQuality monitored
150 cubic meters per second