Statements (48)
Predicate | Object |
---|---|
gptkbp:instanceOf |
railway station
|
gptkbp:accessibility |
Tactile paving
Braille_signage |
gptkbp:built |
gptkb:MMC-Gamuda_Joint_Venture
|
gptkbp:code |
SGL
|
gptkbp:communityImpact |
Increased property values
Reduced traffic congestion Boost to local economy Improved public transport access Enhanced urban development |
gptkbp:design |
Syarikat Perunding KTA Sdn Bhd
|
gptkbp:elevation |
Approximately 20 meters
|
gptkbp:enables |
Yes
|
gptkbp:environmentalImpact |
Noise reduction measures
Sustainable construction practices Reduction in carbon emissions Green space development Promotion of public transport usage |
gptkbp:facilities |
Restrooms
Waiting area Escalators Lifts Retail shops Food and beverage outlets |
gptkbp:futurePlans |
Increased connectivity
Integration with other transport modes Extension_of_MRT_line |
https://www.w3.org/2000/01/rdf-schema#label |
Sungai Long MRT Station
|
gptkbp:locatedIn |
Selangor, Malaysia
|
gptkbp:nextStation |
gptkb:Sungai_Buloh_MRT_Station
Bandar Mahkota Cheras MRT Station |
gptkbp:numberOfStudents |
2
|
gptkbp:numberOfTeams |
2
|
gptkbp:openedIn |
July 16, 2017
|
gptkbp:operator |
gptkb:Prasarana_Malaysia_Berhad
|
gptkbp:parking |
Yes
|
gptkbp:security |
CCTV surveillance
Emergency alarms |
gptkbp:servesLine |
gptkb:Sungai_Buloh-Kajang_Line
|
gptkbp:stations |
SGL
|
gptkbp:structureType |
Elevated
|
gptkbp:surroundingArea |
Public parks
Educational institutions Commercial areas Residential developments Healthcare_facilities |
gptkbp:ticketingSystem |
Touch 'n Go
|
gptkbp:zone |
Zone 2
|