gptkbp:instanceOf
|
gptkb:spacecraft
|
gptkbp:communicationEquipment
|
S-band radio
|
gptkbp:controls
|
Inertial navigation system
|
gptkbp:coolingSystem
|
Phenolic-impregnated carbon ablator
|
gptkbp:crew
|
gptkb:Oleg_Kononenko
gptkb:Satoshi_Furukawa
gptkb:Andrey_Babkin
April 27, 2012
|
gptkbp:crewCapacity
|
gptkb:Soyuz_spacecraft
3
|
gptkbp:diameter
|
2.2 m
|
gptkbp:diedIn
|
gptkb:Environmental_Control_and_Life_Support_System_(ECLSS)
|
gptkbp:duration
|
152 days
|
gptkbp:firstFlight
|
gptkb:Soyuz_TMA-22
April 27, 2012
12:26 UTC
|
gptkbp:hasFunction
|
crew return
|
https://www.w3.org/2000/01/rdf-schema#label
|
Soyuz TMA-22 descent module
|
gptkbp:landingGear
|
parachute
|
gptkbp:launchDate
|
November 14, 2011
12:14_UTC
|
gptkbp:launched
|
gptkb:Soyuz_rocket
Kononenko,_Babkin,_Furukawa
|
gptkbp:launchSite
|
Baikonur Cosmodrome
7,200 kg
|
gptkbp:launchVehicle
|
gptkb:Soyuz-FG
|
gptkbp:length
|
2.5 m
|
gptkbp:manufacturer
|
gptkb:RSC_Energia
|
gptkbp:maxSpeed
|
7 m/s
|
gptkbp:mission
|
crewed spaceflight
|
gptkbp:missions
|
152 days, 19 hours, 25 minutes
|
gptkbp:missionsConducted
|
gptkb:Soyuz_TMA-22_patch
|
gptkbp:operationalHistory
|
part of ISS program
|
gptkbp:operationalStatus
|
retired
|
gptkbp:orbitalInclination
|
90 minutes
|
gptkbp:partOf
|
Soyuz_TMA-22_mission
|
gptkbp:powers
|
Solar panels
|
gptkbp:renovated
|
gptkb:Kazakhstan
ground recovery
|
gptkbp:respondsTo
|
1.5 degrees
Kononenko,_Babkin,_Furukawa
|
gptkbp:secondaryMission
|
gptkb:Soyuz_TMA-23
gptkb:Soyuz_TMA-21
|
gptkbp:speed
|
28,000 km/h
|
gptkbp:successor
|
gptkb:Soyuz_TMA-23
|
gptkbp:tourism
|
gptkb:International_Space_Station
|
gptkbp:travelTime
|
gptkb:Soyuz_TMA
ballistic descent
|
gptkbp:weight
|
7,200 kg
|