Statements (54)
Predicate | Object |
---|---|
gptkbp:instanceOf |
Tunnel
|
gptkbp:aroma |
Mechanical ventilation
|
gptkbp:benefits |
Reduced_congestion_on_Blackwall_Tunnel
|
gptkbp:built |
2019
2025 Approximately 6 years Bored tunneling Navigating existing infrastructure |
gptkbp:community_engagement |
Involved local residents
|
gptkbp:community_involvement |
Job creation
|
gptkbp:connects |
gptkb:Royal_Docks
gptkb:Greenwich_Peninsula |
gptkbp:construction_cost |
£1 billion
|
gptkbp:constructionMaterial |
Recycled materials used
|
gptkbp:decidedBy |
gptkb:Transport_for_London
|
gptkbp:design_feature |
Sustainable materials used
|
gptkbp:emergencyServices |
Provided for emergency services
|
gptkbp:environmental_impact |
Positive
Mitigated by design |
gptkbp:environmentalProtection |
Ongoing during construction
|
gptkbp:features |
Two lanes in each direction
|
gptkbp:feedback |
Incorporated into final design
|
gptkbp:future_plans |
Received in 2016
Expansion of road network |
https://www.w3.org/2000/01/rdf-schema#label |
Silvertown Tunnel
|
gptkbp:impact |
Minimized on local traffic
|
gptkbp:inspiration |
Modern infrastructure projects
|
gptkbp:is_designed_to |
gptkb:Foster_and_Partners
|
gptkbp:is_expected_to |
2025
|
gptkbp:is_funded_by |
Public-Private_Partnership
|
gptkbp:length |
1.4 kilometers
|
gptkbp:lighting |
Energy-efficient LED
|
gptkbp:location |
gptkb:London,_United_Kingdom
|
gptkbp:notableWork |
Key_transport_link_for_East_London
|
gptkbp:opened |
2025
|
gptkbp:owner |
Completed prior to construction
|
gptkbp:parking |
Provided for cyclists
|
gptkbp:partOf |
gptkb:Transport_for_London
|
gptkbp:passenger_traffic |
Over 30,000 vehicles per day
Implemented during construction Improved post-completion |
gptkbp:project |
Managed_by_Transport_for_London
|
gptkbp:public_transport_access |
Integrated with bus services
Enhanced connectivity Included in design |
gptkbp:purpose |
Road traffic
|
gptkbp:related_to |
Thames_Crossing
|
gptkbp:research |
Conducted prior to construction
|
gptkbp:resources |
Held in 2015
|
gptkbp:safety_features |
Advanced monitoring systems
|
gptkbp:status |
Under construction
|
gptkbp:sustainability_initiatives |
Aligned_with_London’s_transport_strategy
|
gptkbp:team |
Led_by_Balfour_Beatty
|
gptkbp:toll |
Yes
|