Qingdao– Guangzhou railway

GPTKB entity

Statements (56)
Predicate Object
gptkbp:instance_of gptkb:railway
gptkbp:connects gptkb:Beijing
gptkb:Shanghai
gptkb:Changsha
gptkb:Nanchang
gptkb:Wuhan
gptkbp:construction_started gptkb:2005
gptkb:2009
gptkbp:electrification gptkb:Yes
gptkbp:environmental_impact Land use planning
Wildlife protection initiatives
Noise reduction measures
Sustainable construction practices
Reduction in carbon emissions
gptkbp:facilities Communication systems
Maintenance depots
Signal systems
Passenger stations
gptkbp:future_plans Expansion of service
Increased train frequency
Upgrades to infrastructure
Integration with other transport systems
https://www.w3.org/2000/01/rdf-schema#label Qingdao– Guangzhou railway
gptkbp:impact Increased tourism
Reduction in travel time
Improved logistics
Economic development in regions served
Urbanization of connected cities
gptkbp:length approximately 2,300 kilometers
gptkbp:max_speed 350 km/h
gptkbp:opened gptkb:2009
gptkbp:operated_by gptkb:China_Railway_High-speed
gptkbp:operates_under gptkb:Guangzhou
gptkb:Qingdao
gptkbp:part_of gptkb:China_Railway
gptkbp:safety_features Emergency response protocols
Train control systems
Regular maintenance checks
Advanced signaling technology
Passenger safety measures
gptkbp:serves gptkb:Guangdong_Province
gptkb:Shandong_Province
gptkbp:significance Major transportation route in China
gptkbp:stations gptkb:Shenzhen_North
gptkb:Jinan
gptkb:Zhengzhou
gptkb:Guangzhou_South
gptkb:Wuhan
gptkb:Changsha_South
Nanchang West
Qingdao East
gptkbp:track_gauge 1,435 mm (standard gauge)
gptkbp:travel_time approximately 10 hours
gptkbp:type gptkb:high-speed_rail
gptkbp:bfsParent gptkb:Qingdao_Railway_Station
gptkbp:bfsLayer 6