Statements (16)
Predicate | Object |
---|---|
gptkbp:instanceOf |
Power Station
|
gptkbp:capacity |
1,400 MW
|
gptkbp:commissioned |
1994
|
gptkbp:emissionsStandard |
Installed emissions control systems
|
gptkbp:environmentalImpact |
Regulated_by_Malaysian_environmental_laws
|
gptkbp:fuelType |
Natural gas
|
gptkbp:gridConnection |
gptkb:National_Grid_of_Malaysia
|
https://www.w3.org/2000/01/rdf-schema#label |
Pasir Gudang Power Station
|
gptkbp:location |
Pasir Gudang, Johor, Malaysia
|
gptkbp:maintenance |
Regular maintenance schedule
|
gptkbp:numberOfStudents |
4
|
gptkbp:operationalStatus |
1994
|
gptkbp:owner |
gptkb:Tenaga_Nasional_Berhad
|
gptkbp:status |
Active
|
gptkbp:technology |
Combined cycle gas turbine (CCGT)
|
gptkbp:type |
Gas-fired power station
|