Statements (56)
Predicate | Object |
---|---|
gptkbp:instanceOf |
railway line
|
gptkbp:connects |
gptkb:Kiruna
Luleå |
gptkbp:constructionMaterial |
1903
|
gptkbp:constructionStarted |
1895
|
gptkbp:electrification |
yes
|
gptkbp:hasClient |
gptkb:Haparanda_Line
Inlandsbanan Botniabanan Malmbanan |
gptkbp:hasFeature |
regular inspections
automatic signaling level crossings track repairs station upkeep |
gptkbp:hasHistory |
historical significance
enhanced accessibility influenced settlement patterns upgraded infrastructure promoted trade supported local communities contributed to economic growth utilized advanced technology facilitated tourism integrated with national rail system important for mining industry adapted to modern needs fostered regional identity developed regional transport adapted to changing demands encouraged environmental considerations linked remote areas navigated harsh climates remains a vital transport link sustained operations over decades part_of_Swedish_railway_expansion |
gptkbp:hasService |
passenger trains
freight trains |
gptkbp:hasStations |
gptkb:Boden_Station
gptkb:Gällivare_Station gptkb:Luleå_Station gptkb:Kiruna_Station |
https://www.w3.org/2000/01/rdf-schema#label |
Norrbotten Line 1
|
gptkbp:length |
approximately 500 kilometers
|
gptkbp:locatedIn |
gptkb:Sweden
|
gptkbp:opened |
1903
|
gptkbp:operatedBy |
gptkb:Swedish_Transport_Administration
|
gptkbp:operationalStatus |
active
|
gptkbp:partOf |
Norrbotten railway network
|
gptkbp:previouslyKnownAs |
Luleå-Kiruna_Line
|
gptkbp:region |
gptkb:Norrbotten_County
|
gptkbp:serves |
freight transport
passenger transport |
gptkbp:track |
1435 mm
|
gptkbp:trainTypes |
main line
|
gptkbp:type |
standard gauge
|