Statements (52)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:infrastructure_project
|
gptkbp:access |
Multiple entry and exit ramps
|
gptkbp:agent |
gptkb:Department_of_Public_Works_and_Highways
|
gptkbp:benefits |
Reduced traffic congestion
Improved air quality Faster travel times |
gptkbp:built |
1995
Segmental construction |
gptkbp:community_engagement |
Generally positive
|
gptkbp:community_impact |
Noise pollution
Displacement of residents Air pollution reduction |
gptkbp:connects |
gptkb:North_Luzon_Expressway
gptkb:South_Luzon_Expressway |
gptkbp:construction_cost |
Approximately $1 billion
|
gptkbp:design |
Cantilevered design
|
gptkbp:environmental_impact |
Increased property values
Job creation Mitigated through planning Boosted local businesses |
gptkbp:features |
Interchanges
Overpasses Toll_plazas |
gptkbp:future_plans |
Expansion_to_Cavite
Connection_to_NAIA_Expressway |
gptkbp:futurePlans |
Planned
|
https://www.w3.org/2000/01/rdf-schema#label |
Metro Manila Skyway Project
|
gptkbp:is_funded_by |
Public-Private_Partnership
|
gptkbp:length |
approximately 30 kilometers
|
gptkbp:location |
gptkb:Metro_Manila
|
gptkbp:maintenance |
Regular inspections
Road repairs Toll collection management |
gptkbp:notableWork |
Skyway Stage 3
Skyway Stage 4 |
gptkbp:number_of_stages |
2010
|
gptkbp:opened |
2001
|
gptkbp:operator |
gptkb:Skyway_Operations_and_Maintenance_Corporation
|
gptkbp:passenger_traffic |
Over 200,000 vehicles per day
2 to 4 lanes Integrated with local traffic systems |
gptkbp:project |
gptkb:Metro_Pacific_Tollways_Corporation
|
gptkbp:public_transport_access |
Bus rapid transit systems
Commuter rail systems |
gptkbp:safety_features |
Lighting systems
CCTV surveillance Emergency lanes |
gptkbp:sequel |
2000
2003 |
gptkbp:specialty |
gptkb:C.M._Pancho_Construction
|
gptkbp:toll |
Yes
|
gptkbp:type |
Elevated expressway
|