Kihansi Hydroelectric Power Station

GPTKB entity

Properties (53)
Predicate Object
gptkbp:instanceOf gptkb:hydroelectric_power_station
gptkbp:built 1994
1999
gptkbp:capacity 180 MW
gptkbp:commissioned 1999
gptkbp:community_impact positive
gptkbp:community_involvement yes
job creation
gptkbp:construction_cost $300 million
gptkbp:drainageBasin regulated
gptkbp:electrification electricity
gptkbp:emissionsStandard low
gptkbp:engineType gptkb:Francis_turbine
3
gptkbp:environmental_impact considered
Kihansi Spray Toad population decline
gptkbp:fuel_capacity improved over time
gptkbp:future_plans expansion considered
gptkbp:gridConnection Tanzania_national_grid
gptkbp:height 60 m
https://www.w3.org/2000/01/rdf-schema#label Kihansi Hydroelectric Power Station
gptkbp:is_a_source_of electricity generation
gptkbp:is_monitored_by ongoing
gptkbp:length 200 m
gptkbp:lighting yes
gptkbp:location Kihansi_River,_Tanzania
gptkbp:maintenance regular
gptkbp:notableFeature aligned with national goals
gptkbp:operational_status 180 MW
gptkbp:operator gptkb:Tanzania_Electric_Supply_Company_Limited
gptkbp:owner gptkb:Government_of_Tanzania
gptkbp:partnerships with NGOs
gptkbp:powerOutput hydropower
to local grid
gptkbp:productionYears 1,200 GWh
gptkbp:project gptkb:Tanzania_Electric_Supply_Company_Limited
renewable energy project
gptkbp:public_perception campaigns conducted.
gptkbp:region important_for_Tanzania's_energy_supply
gptkbp:regulatoryBody gptkb:Energy_and_Water_Utilities_Regulatory_Authority
gptkbp:research conducted on environmental impact
gptkbp:reservoir gptkb:Kihansi_Reservoir
gptkbp:river gptkb:Kihansi_River
gptkbp:safetyFeatures implemented
gptkbp:spillwayType gated spillway
gptkbp:status operational
gptkbp:sustainability renewable energy source
gptkbp:tourism attracts visitors
gptkbp:type gravity dam
gptkbp:waterManagement integrated
gptkbp:waterQuality gptkb:Kihansi_River
monitored
gptkbp:wildlife affected by operations