gptkbp:instanceOf
|
gptkb:hydroelectric_power_station
|
gptkbp:built
|
1994
1999
|
gptkbp:capacity
|
180 MW
|
gptkbp:commissioned
|
1999
|
gptkbp:community_impact
|
positive
|
gptkbp:community_involvement
|
yes
job creation
|
gptkbp:construction_cost
|
$300 million
|
gptkbp:drainageBasin
|
regulated
|
gptkbp:electrification
|
electricity
|
gptkbp:emissionsStandard
|
low
|
gptkbp:engineType
|
gptkb:Francis_turbine
3
|
gptkbp:environmental_impact
|
considered
Kihansi Spray Toad population decline
|
gptkbp:fuel_capacity
|
improved over time
|
gptkbp:future_plans
|
expansion considered
|
gptkbp:gridConnection
|
Tanzania_national_grid
|
gptkbp:height
|
60 m
|
https://www.w3.org/2000/01/rdf-schema#label
|
Kihansi Hydroelectric Power Station
|
gptkbp:is_a_source_of
|
electricity generation
|
gptkbp:is_monitored_by
|
ongoing
|
gptkbp:length
|
200 m
|
gptkbp:lighting
|
yes
|
gptkbp:location
|
Kihansi_River,_Tanzania
|
gptkbp:maintenance
|
regular
|
gptkbp:notableFeature
|
aligned with national goals
|
gptkbp:operational_status
|
180 MW
|
gptkbp:operator
|
gptkb:Tanzania_Electric_Supply_Company_Limited
|
gptkbp:owner
|
gptkb:Government_of_Tanzania
|
gptkbp:partnerships
|
with NGOs
|
gptkbp:powerOutput
|
hydropower
to local grid
|
gptkbp:productionYears
|
1,200 GWh
|
gptkbp:project
|
gptkb:Tanzania_Electric_Supply_Company_Limited
renewable energy project
|
gptkbp:public_perception
|
campaigns conducted.
|
gptkbp:region
|
important_for_Tanzania's_energy_supply
|
gptkbp:regulatoryBody
|
gptkb:Energy_and_Water_Utilities_Regulatory_Authority
|
gptkbp:research
|
conducted on environmental impact
|
gptkbp:reservoir
|
gptkb:Kihansi_Reservoir
|
gptkbp:river
|
gptkb:Kihansi_River
|
gptkbp:safetyFeatures
|
implemented
|
gptkbp:spillwayType
|
gated spillway
|
gptkbp:status
|
operational
|
gptkbp:sustainability
|
renewable energy source
|
gptkbp:tourism
|
attracts visitors
|
gptkbp:type
|
gravity dam
|
gptkbp:waterManagement
|
integrated
|
gptkbp:waterQuality
|
gptkb:Kihansi_River
monitored
|
gptkbp:wildlife
|
affected by operations
|