Porąbka Dam
E817413
Porąbka Dam is a concrete gravity dam in southern Poland that creates the Międzybrodzkie Lake reservoir and is used for hydroelectric power generation and flood control.
All labels observed (1)
| Label | Occurrences |
|---|---|
| Porąbka Dam canonical | 1 |
How this entity was disambiguated
This entity first appeared as the object of triple T9724430 — resolving that mention is where its identity was fixed. The disambiguator weighed these candidate entities and picked the highlighted one (or “None”, minting a new entity). This is how homonymy is resolved: the same surface form can point to different entities.
Target entity: Porąbka Dam Context triple: [Soła River, hasDam, Porąbka Dam]
-
A.
Rożnów Dam
Rożnów Dam is a hydroelectric and flood-control dam on the Dunajec River in southern Poland, forming the artificial Rożnów Lake.
-
B.
Niedzica Dam
Niedzica Dam is a large hydroelectric and flood-control dam on the Dunajec River in southern Poland, known for forming the scenic Czorsztyn Lake and serving as a major regional tourist attraction.
-
C.
Koronowo Dam
Koronowo Dam is a hydroelectric and flood-control dam in northern Poland that creates the Koronowo Reservoir on the Brda River.
-
D.
Rzeszów Dam
Rzeszów Dam is a hydraulic structure in southeastern Poland that creates the Rzeszów Reservoir on the Wisłok River, serving purposes such as water management, flood control, and recreation for the city of Rzeszów.
-
E.
Otmuchów Reservoir
Otmuchów Reservoir is a large artificial lake in southwestern Poland, primarily used for flood control, water management, and recreation along the Nysa Kłodzka River.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Target entity: Porąbka Dam Target entity description: Porąbka Dam is a concrete gravity dam in southern Poland that creates the Międzybrodzkie Lake reservoir and is used for hydroelectric power generation and flood control.
-
A.
Rożnów Dam
Rożnów Dam is a hydroelectric and flood-control dam on the Dunajec River in southern Poland, forming the artificial Rożnów Lake.
-
B.
Niedzica Dam
Niedzica Dam is a large hydroelectric and flood-control dam on the Dunajec River in southern Poland, known for forming the scenic Czorsztyn Lake and serving as a major regional tourist attraction.
-
C.
Koronowo Dam
Koronowo Dam is a hydroelectric and flood-control dam in northern Poland that creates the Koronowo Reservoir on the Brda River.
-
D.
Rzeszów Dam
Rzeszów Dam is a hydraulic structure in southeastern Poland that creates the Rzeszów Reservoir on the Wisłok River, serving purposes such as water management, flood control, and recreation for the city of Rzeszów.
-
E.
Otmuchów Reservoir
Otmuchów Reservoir is a large artificial lake in southwestern Poland, primarily used for flood control, water management, and recreation along the Nysa Kłodzka River.
- F. None of above. chosen
Statements (25)
| Predicate | Object |
|---|---|
| instanceOf |
concrete dam
ⓘ
gravity dam ⓘ hydroelectric dam ⓘ infrastructure ⓘ |
| continent | Europe ⓘ |
| country | Poland ⓘ |
| createsReservoir | Międzybrodzkie Lake NERFINISHED ⓘ |
| damType | gravity dam ⓘ |
| hasFunction |
electricity generation
ⓘ
flood mitigation ⓘ |
| hasHydroelectricPlant | Porąbka Hydroelectric Power Plant NERFINISHED ⓘ |
| locatedIn | southern Poland ⓘ |
| locatedInCountry | Poland NERFINISHED ⓘ |
| locatedInValley | Soła Valley NERFINISHED ⓘ |
| locatedNear | Porąbka, Poland NERFINISHED ⓘ |
| locatedOnRiver | Soła River NERFINISHED ⓘ |
| material | concrete ⓘ |
| partOf | Soła River cascade NERFINISHED ⓘ |
| primaryUse | hydroelectric power generation ⓘ |
| region | Silesian Voivodeship NERFINISHED ⓘ |
| reservoirName | Międzybrodzkie Lake NERFINISHED ⓘ |
| reservoirUse |
recreation
ⓘ
water storage ⓘ |
| use | flood control ⓘ |
| waterbodyCreated | Międzybrodzkie Lake NERFINISHED ⓘ |
How these facts were elicited
The pipeline generated the facts above by prompting gpt-5.1 with this entity's name + description and the instruction below.
You are a knowledge base construction expert. Given a subject entity and a description of it, return factual statements that you know for the subject as a JSON list of dictionaries(triples), where keys must be "subject", "predicate" and "object". The number of facts may be very high, between 25 to 50 or more, for very popular subjects. For less popular subjects, the number of facts can be very low, like 5 or 10. # Requirements - If you don't know the subject at all, return an empty list. - If the subject is not a named entity, return an empty list. - Include at least one triple where predicate is "instanceOf". - Do not get too wordy. - Separate several objects into multiple triples with one object.
Subject: Porąbka Dam Description of subject: Porąbka Dam is a concrete gravity dam in southern Poland that creates the Międzybrodzkie Lake reservoir and is used for hydroelectric power generation and flood control.
Referenced by (1)
Full triples — surface form annotated when it differs from this entity's canonical label.