Upper Snake River Project

E744814

The Upper Snake River Project is a U.S. Bureau of Reclamation water management and irrigation system in the upper Snake River Basin that includes multiple dams, reservoirs, and related infrastructure for flood control, power generation, and agricultural use.

All labels observed (2)

How this entity was disambiguated

Statements (46)

Predicate Object
instanceOf Bureau of Reclamation project
water management project
basin Columbia River Basin
benefits agricultural production
electricity supply
flood risk reduction
recreation
country United States
governingBody United States Department of the Interior
hasPart American Falls Dam
American Falls Reservoir
Jackson Lake Dam
Jackson Lake Reservoir
linked to: Jackson Lake

Lake Walcott NERFINISHED
Milner Dam
Milner Reservoir
Minidoka Dam
Palisades Dam
Palisades Reservoir
diversion works
hydroelectric powerplants
irrigation canals
infrastructureType canals
dams
powerplants
reservoirs
locatedIn Idaho
Wyoming
upper Snake River Basin
linked to: Snake River Basin
managingAgency United States Bureau of Reclamation
operator United States Bureau of Reclamation
partOf federal reclamation program
purpose flood control
hydroelectric power generation
irrigation
municipal water supply
water storage
regionServed Upper Snake River Basin
linked to: Snake River Basin

southern Idaho
regulates Snake River streamflow
river Snake River
sector agriculture
energy
water resources management
supports irrigated farming in southern Idaho
waterSource Snake River

How these facts were elicited

Referenced by (3)

Full triples — surface form annotated when it differs from this entity's canonical label.

Palisades Dam partOf Upper Snake River Project
Island Park Reservoir partOf Upper Snake River irrigation system
linked to: Upper Snake River Project
Palisades Reservoir partOf Upper Snake River Project