Statements (55)
Predicate | Object |
---|---|
gptkbp:instanceOf |
metro system
|
gptkbp:accessibility |
wheelchair accessible
|
gptkbp:annualRidership |
over 1 billion
|
gptkbp:built |
2005
tunneling cut-and-cover |
gptkbp:design |
modern and efficient
|
gptkbp:environmental_impact |
reduces traffic congestion
|
gptkbp:frequency |
2-5 minutes
|
gptkbp:futurePlans |
planned to reach 500 km by 2025
|
gptkbp:headquarters |
Chengdu,_Sichuan_Province
|
https://www.w3.org/2000/01/rdf-schema#label |
Chengdu Metro system
|
gptkbp:integration |
bus services
|
gptkbp:length |
around 300 km
|
gptkbp:location |
gptkb:Chengdu,_China
|
gptkbp:notableFeature |
Line 11
Line 12 Line 17 Line 14 Line 18 Line 15 Line 13 Line 16 |
gptkbp:opened |
Line 10
September 27, 2010 |
gptkbp:operator |
gptkb:Chengdu_Metro_Group
|
gptkbp:productLine |
10
Line 1 |
gptkbp:safety_features |
CCTV surveillance
|
gptkbp:significantEvent |
Line 10 opening
Line 11 construction start Line 12 construction start Line 13 construction start Line 14 construction start Line 15 construction start Line 16 construction start Line 17 construction start Line 18 construction start Line 2 extension opening Line 3 opening Line 4 opening Line 5 opening Line 6 opening Line 7 opening Line 8 opening Line 9 opening |
gptkbp:stations |
gptkb:Tianfu_Square
gptkb:Chengdu_South_Railway_Station gptkb:Chengdu_East_Railway_Station gptkb:Chengdu_University_of_Technology_Station 200 Wuhouci Station |
gptkbp:ticketingSystem |
distance-based fare
contactless smart card |
gptkbp:transportation |
rapid transit
|