Channel Tunnel system

GPTKB entity

Statements (52)
Predicate Object
gptkbp:instanceOf tunnel system
gptkbp:associated_with Eurotunnel
Eurostar
Le Shuttle
gptkbp:built 1988
1994
gptkbp:challenges financial difficulties
technical issues
regulatory hurdles
gptkbp:connects gptkb:France
gptkb:United_Kingdom
gptkbp:contains railway tunnels
service tunnel
gptkbp:cultural_significance tourist attraction
engineering achievement
symbol of cooperation
gptkbp:depth up to 75 meters below sea level
gptkbp:environmental_impact wildlife considerations
pollution control measures
studies conducted
gptkbp:features passenger services
high-speed rail
vehicle transport
gptkbp:future_plans expansion proposals
increased capacity
technological upgrades
gptkbp:historical_significance first fixed link between UK and mainland Europe
major engineering project of the 20th century
part_of_European_integration_efforts
https://www.w3.org/2000/01/rdf-schema#label Channel Tunnel system
gptkbp:impact tourism
trade
economic growth
gptkbp:is_used_in freight transport
passenger transport
gptkbp:length 50.45 kilometers
gptkbp:location gptkb:English_Channel
gptkbp:maintenance upgrades
regular inspections
repairs
gptkbp:opened 1994
gptkbp:operates_in Eurotunnel
gptkbp:operational_status active
gptkbp:safety_features emergency exits
ventilation systems
fire detection systems
gptkbp:scholarships government funding
public-private partnership
private investment
gptkbp:significance major transport link
gptkbp:toll Eurotunnel Le Shuttle
gptkbp:travelTime 35 minutes by Eurostar