Caracas tramway

GPTKB entity

Statements (49)
Predicate Object
gptkbp:instanceOf tramway system
gptkbp:accessibility Wheelchair accessible
gptkbp:annualRidership approximately 20,000 passengers
gptkbp:averageTemperature 7.5 km
gptkbp:challenges Funding and maintenance issues
gptkbp:communityEngagement Public consultations held
gptkbp:communityFeedback Generally positive
gptkbp:communityImpact Improved access to neighborhoods
gptkbp:connects gptkb:Caracas_Metro
gptkbp:constructionMaterial 2006
Estimated at $200 million
gptkbp:constructionStarted 2003
gptkbp:culturalSignificance Promotes public transport use
gptkbp:currentStatus La Rinconada
gptkbp:design Modern design
gptkbp:electrification overhead catenary
gptkbp:environmentalImpact Reduced traffic congestion
gptkbp:fareSystem Distance-based fares
Approximately 0.50 USD
gptkbp:futurePlans Planned extensions
Expansion to new areas
gptkbp:historicalContext Part of urban transport development
https://www.w3.org/2000/01/rdf-schema#label Caracas tramway
gptkbp:integration Integrated with bus services
gptkbp:length 7.5 km
gptkbp:location gptkb:Caracas,_Venezuela
gptkbp:maintenance Regular maintenance schedule
gptkbp:mission Available online
gptkbp:nextStation El Silencio
gptkbp:numberOfStations 12
gptkbp:opened 2006
gptkbp:operatedBy Metropolitan_Transport_of_Caracas
gptkbp:operationalStatus Operational
gptkbp:partnerships Collaborations with local businesses
gptkbp:partOf Public transport network
gptkbp:productLine 1
Line 1
gptkbp:project Government funding
gptkbp:publicPerception Seen as a modern transport solution
gptkbp:rollingStock Tram vehicles
gptkbp:safetyFeatures CCTV surveillance
gptkbp:services 10-15 minutes
5 AM to 11 PM
gptkbp:succeededBy Government support and planning
gptkbp:sustainability Promotes eco-friendly transport
gptkbp:technology Modern tram technology
gptkbp:ticketingSystem Contactless smart cards
gptkbp:type light rail
gptkbp:userDemographics Diverse user base